background image

8

9

INSTALLATION AND OPERATION MANUAL SOLAR MODULES DUO-G5.X – Q CELLS

INSTALLATION AND OPERATION MANUAL SOLAR MODULES DUO-G5.X – Q CELLS

Fig. 3: 

Installation options for crystalline Q CELLS modules. All dimensions are given in inch (mm in brackets). Also observe 
the maximum test loads and clamping range as specified on the following page.  
The illustrated installation options apply for both horizontal and vertical module orientation. 

 

Module 

Clamp 

Subconstruction 

Mounting profile

TYPE OF 
INSTALLATION

MODULE

POINT MOUNTING SYSTEM

LINEAR MOUNTING SYSTEM

INSTALLATION 
WITH CLAMPS

Q.PEAK DUO-G5.X
Q.PEAK DUO BLK-G5.X
Q.PLUS DUO-G5.X
Q.PLUS DUO BFR-G5.X

HYBRID  
CLAMPING

Q.PEAK DUO-G5.X
Q.PEAK DUO BLK-G5.X
Q.PLUS DUO-G5.X
Q.PLUS DUO BFR-G5.X

INSTALLATION  
ON MOUNTING  
POINTS

Q.PEAK DUO-G5.X
Q.PEAK DUO BLK-G5.X
Q.PLUS DUO-G5.X
Q.PLUS DUO BFR-G5.X

INSTALLATION 
WITH INSERTION 
PROFILES

Q.PEAK DUO-G5.X
Q.PEAK DUO BLK-G5.X
Q.PLUS DUO-G5.X
Q.PLUS DUO BFR-G5.X

NOT PERMITTED

2  PLANNING

2.3  MOUNTING OPTIONS

11.81 - 17.72

300 - 450

NA

0 - 9.84 

(0 - 250)

CL5

CL2a

0 - 11.81
(0 - 300)

CL2b

0 - 11.81
(0 - 300)

0 - 11.81
(0 - 300)

CL2a

0 - 11.81
(0 - 300)

CL2b

CL2a

0 - 7.87

(0 - 200)

CL2b

0 - 7.87

(0 - 200)

IP1

IP2

IP1

IP2

IP1

IP2

IP1

IP2

CL2a

0 - 11.81
(0 - 300)

CL2b

0 - 11.81
(0 - 300)

0 - 11.81
(0 - 300)

CL2a

0 - 11.81
(0 - 300)

CL2b

CL2a

0 - 7.87

(0 - 200)

CL2b

0 - 7.87

(0 - 200)

NA

4 × mounting 
slots

13.88

(352.5)

FB2

4 x mounting 
slots

NA

13.88
(352.5)

FB1

0 - 9.84

(0 - 250)

9.84 - 17.72

(250 - 450)

17.72 - 21.65

(450 - 550)

North 
America

CL1

CL1

0 - 7.87

(0 - 200)

7.87 - 13.78

(200 - 350)

13.78 - 17.72

(350 - 450)

CL3

CL4

0 - 11.81
(0 - 300)

0 - 11.81
(0 - 300)

9.84 - 17.72
(250 - 450)

7.87 - 13.78
(200 - 350)

North 
America

CL3

CL4

Specifications

MODULE TYPE

MOUNTING
OPTION

POSITION OF 
CLAMPS* [IN (MM)]

TEST LOAD  
PUSH/PULL** [PA] 

DESIGN LOAD 
PUSH/PULL** [PA] 

SAFETY  
FACTOR

Q.PEAK DUO-G5.X

Q.PEAK DUO BLK-G5.X

Q.PLUS DUO-G5.X

Q.PLUS DUO BFR-G5.X

CL1 / CL3

9.84 - 17.72  
(250 - 450)

5400/4000

3600/2670

1.5

FB1 / FB2

13.88 (352.5)

IP1

-

CL1

0 - 9.84 (0 - 250)  
17.72 - 21.65 (450 - 550)

2400/2400

1600/1600

CL2a (with rails) /  

CL2b (without rails)

0 - 11.81 (0 - 300)

CL4

0 - 11.81 (0 - 300)

CL5

short side: 0 - 9.84  
(0 - 250)
long side: 11.81 - 17.72 
(300 - 450)

4000/4000

2670/2670

 

Ä

The below mounting options are only possible under certain conditions.

MODULE TYPE

MOUNTING  
OPTION

POSITION OF 
CLAMPS* [MM]

TEST LOAD  
PUSH/PULL*** 
[PA] 

DESIGN LOAD 
PUSH/PULL*** 
[PA] 

SAFETY  
FACTOR

Q.PEAK DUO-G5.X

Q.PEAK DUO BLK-G5.X

Q.PLUS DUO-G5.X

Q.PLUS DUO BFR-G5.X

IP2

-

2400/2200

1600/1470

1.5


** 
*** 

Distance between outer edge of module and middle of the clamp. 
Loads according to IEC 61215-2:2016 and UL 1703. 
Test procedure according to IEC 61215-2:2016 and UL 1703. Mounting options do not fulfill the requirements of the standards.

ATTENTION

 

Ä

The loads in the table are related to the mechanical stability of the solar modules. The mechanical stability of the mounting system 
including clamps has to be evaluated by the system supplier. The Q CELLS listed test load values were determinded with the 
following clamp parameters: clamp width = 1.58 in (40 mm) and clamp depth = 0.39 in (10 mm). The system installer is responsible 
for the determination of location-specific load requirements.

 

Ä

Ensure, that the subconstruction does not touch the junction box (even under load). Ensure that the clamps or insertion profiles 
etc. do not touch the glass (even under load).

 

Ä

Ensure, that the connection cables of the junction box do not run between laminate and mounting rails.

 

Ä

Ensure, minimum support depth of 0.59 in (15 mm) on the back side of the module for IP1, IP2, CL2b, CL3, CL4 and CL5. Ensure 
minimum support depth of 0.39 in (10 mm) on the front side of the module for IP1 and IP2.

 

Ä

CL1, CL2a and CL3 with rails: Ensure that module frame is fixed directly on the rail of the substructure (no spacer allowed between 
the module and substructure).

 

Ä

Module bend under loads. Therefore, sharp objects (e.g. screws) must not be mounted near the module backside.

 

Ä

Use M8 corrosion-proof screws and washers (diameter ≥ 15.8 mm or ≥ 0.62 in) for FB1 and FB2 mounting.

2  PLANNING

2.3  MOUNTING OPTIONS

Summary of Contents for Q.PEAK DUO-G5 series

Page 1: ...Valid for North America INSTALLATION AND OPERATION MANUAL DUO G5 X solar module series...

Page 2: ...llowing regulations and standards must be upheld at all times during the installation operation and maintenance of the solar modules Installation and Operation Manual Other applicable documents such a...

Page 3: ...ORIZED MODIFICATION Fig 1 External dimensions in inch mm and components for Q PEAK DUO G5 Q PEAK DUO BLK G5 Q PLUS DUO G5 Q PLUS DUO BFR G5 Q PEAK DUO G5 2 Q PEAK DUO BLK G5 2 Q PLUS DUO G5 2 Q PLUS D...

Page 4: ...ns Operating temperatures from 40 F to 185 F Pull loads and push loads according to chapter 2 3 Test Load in accordance with IEC 61215 and Design Load 1 5 in accor dance with UL 1703 Installation usin...

Page 5: ...3 88 352 5 IP1 CL1 0 9 84 0 250 17 72 21 65 450 550 2400 2400 1600 1600 CL2a with rails CL2b without rails 0 11 81 0 300 CL4 0 11 81 0 300 CL5 short side 0 9 84 0 250 long side 11 81 17 72 300 450 400...

Page 6: ...g the maximum number of modules in the string Parallel Connection Modules may be damaged by the occurrence of reverse currents caused by module defects ground leaks or defective insulation Ensure that...

Page 7: ...e damage may occur Never step on modules Do not subject modules to any mechanical stress Do not allow any objects to fall onto modules 3 INSTALLATION 3 1 SAFETY AND TRANSPORT DANGER Risk of fatal inju...

Page 8: ...result from the separation of a closed circuit These can result in life threatening injuries The danger increases when several modules are connected in series Please be aware of that the entire open c...

Page 9: ...ersonnel see page 3 Ensure correct polarity Use solar cables for the connection at the junction box outlet Use the same inverter compatible plugs Use minimum No 12 AWG copper wires insulated for a min...

Page 10: ...l shock or fire the frame of the module as well as any non current carrying metal parts of the system must be grounded While this section provides some information about grounding the Q CELLS frames a...

Page 11: ...rost 0 6 MAINTENANCE AND CLEANING Free the substructure from any dirt and debris leaves bird nests etc Remove dirt with lukewarm water or alcohol based glass cleaner a broom or a soft cloth Do not use...

Page 12: ...400 Spectrum Center Drive Suite 1400 Irvine CA 92618 USA TEL 1 949 748 59 69 EMAIL inquiry us q cells com WEB www q cells us Subject to change without notice Q CELLS Installation manual solar modules...

Reviews: