background image

14

15

INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO-G6.X+ – Q CELLS

INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO-G6.X+ – Q CELLS

14

15

DANGER! 
Risk of fatal injury due to electric shock!

When disconnecting an electric circuit carrying direct current, 
electric arcs can occur that may result in life-threatening injuries.

 

Ä

Do NOT unplug the cable when under load.

 

Ä

Do NOT connect any exposed cable ends.

 

Ä

Electrical work may only be performed by qualified and 
skilled personnel (see page 3).

A solar module generates electrical current and voltage even 
at a low intensity of illumination. Sparks and electric arcs may 
result from the separation of a closed circuit. These can result 
in life-threatening injuries. The danger increases when several 
modules are connected in series.

 

Ä

Please be aware of that the entire open circuit voltage is 
active even at low levels of solar irradiation. 

 

Ä

Please follow the valid national regulations and safety guidelines 
for the installation of electrical devices and systems.

 

Ä

Please make sure to take all necessary safety precautions. 
With module or phase voltages of more than 120 V, the safety 
extra-low voltage range is exceeded.

 

Ä

Carry out work on the inverter and the wiring with extreme 
caution.

 

Ä

Ensure that the modules are disconnected at the inverter 
prior to separation.

 

Ä

Be sure to observe the time intervals specified by the inverter 
manufacturer after switching off the inverter.

 

Ä

Make sure that the plugs can not be connected unintentionally.

 

Ä

Before working on the contacts, check them for safety extra-low 
voltage.

Danger! Risk of fatal injury due to electric 
shock! 

 

Ä

Never open the junction box.

 

Ä

Do not remove bypass diodes.

Danger! Risk of fatal injury due to electric 
shock! 

 

Ä

Never touch live contacts with bare hands.

 

Ä

Cover connectors by suitable protective caps 
until installation.

Danger! Risk of fatal injury due to electric 
shock! 

 

Ä

Insulate any exposed cable ends.

 

Ä

Only connect cables with plugs.

Danger! Risk of fatal injury due to electric 
shock! 

 

Ä

Only use dry, insulated tools for electrical work.

4  ELECTRICAL CONNECTION

4.1  SAFETY

Danger! Risk of fatal injury due to electric 
shock! 

 

Ä

Be sure to maintain the time intervals as 
specified by the inverter manufacturer between 
switching off the inverter and beginning any 
further work.

Danger! Risk of fatal injury due to electric 
shock! 

 

Ä

Never plug or unplug the cable when under 
load. Modules must not carry any current.

1.

 Switch off the inverter.

OFF

EN

4  ELECTRICAL CONNECTION

4.2 ELECTRICAL INSTALLATION SAFETY

2.

 Switch off the DC circuit breaker.

3.

 Measure shutdown in DC String. 

(no DC current flow).

4.

 Disconnect plugs by the use of appropriate 

and qualified tools of the manufacturer.

5.

 When connecting the modules proceed in 

reverse order.

Danger! Risk of fatal injury due to electric 
shock! 

 

Ä

Electrical work may only be performed by 
qualified and skilled personnel (see page 3).

 

Ä

Ensure correct polarity.

Summary of Contents for Q.PEAK DUO BLK-G6

Page 1: ...INSTALLATION AND OPERATION MANUAL Q PEAK DUO G6 X solar module series Valid for Africa Europe LatinAmerica South America ...

Page 2: ...ssure equipment operational safety hazardous goods and environmental protection Regulations and requirements specific to the system Any applicable laws and requirements in particular inter national country specific regional laws and stipulations governing the planning installation and operation of solar power systems and work on roofs Any valid international national and regional regulations gover...

Page 3: ...ionsandpermitrequirements prior to installation of the solar power system Your financial success depends on the fulfillment of these requirements Other applicable documents In addition to this Manual following technical information are relevant DOCUMENT TYPE Product data sheet Packaging and transport information Fig 1 External dimensions and components for Q PEAK DUO G6 Q PEAK DUO G6 Q PEAK DUO BL...

Page 4: ...tructure Ensures sufficient rear ventilation of the module Avoid the usage of different metals to prevent contact corrosion Allows for stress free expansion and contraction due to temperature fluctuations Ä Ä Ensure that no additional forces are applied through the mounting system into the module except for the wind and snow loads Additional forces and moments of torque at the mounting positions c...

Page 5: ...ws and washers diameter 15 8mm or 0 62in for FB1 and FB2 mounting Module Selection Fordetailedkeyelectricaldata pleaserefertotheactualdatasheet referring to the relevant Module available at www q cells com Ä Ä For maximum energy yields mismatches of specified electric current IMPP ofmorethan5 shouldbeavoidedforallmodules connected in series Safety Factor During normal operation a module may genera...

Page 6: ...ot install damaged modules Ä Ä Inform your distributor of any damages immediately Note Module damage may occur Ä Ä Do not stack modules Note Module damage may occur Ä Ä Do not install modules near flammable gas vapors Ä Ä Do not install modules in close proximity to air conditioning systems Note Module damage may occur Ä Ä Do not drop modules Note Module damage may occur Ä Ä Only make modification...

Page 7: ...shock Ä Ä Only use dry insulated tools Ä Ä Do not carry out the installation alone Only install undamaged modules and components Ä Ä Do not modify the module e g do not drill any additional holes 3 INSTALLATION 3 2 PREPARATION OF INSTALLATION Option 1 Ä Ä Fasten the module with 4 clamps in the specified clamping range see Fig 2 p 7 Ä Ä Tighten clamps according to manufacturer s instructions Ä Ä Ma...

Page 8: ...ervals specified by the inverter manufacturer after switching off the inverter Ä Ä Make sure that the plugs can not be connected unintentionally Ä Ä Beforeworkingonthecontacts checkthemforsafetyextra low voltage Danger Risk of fatal injury due to electric shock Ä Ä Never open the junction box Ä Ä Do not remove bypass diodes Danger Risk of fatal injury due to electric shock Ä Ä Never touch live con...

Page 9: ...geous to rotate some modules 180 Ä Ä Module orientation can clearly be identified from the front side by the serial number and barcode labelled behind the module glass on the side with negative connection cable EN Inverter 180 180 SOLAR Ä Ä Ensure that all necessary safety and functional tests have been carried out according to applicable standards Note Module damage may occur Ä Ä Ensure that the ...

Page 10: ...tified personnel Ä Ä The time intervals and extent of the inspection can depend on local circumstances e g salt ammonia content in the air high humidity etc The customer operator must inform himself about time intervals and extend of necessary inspections Ä Ä Inspectionshavetobeperformedespeciallyafterextraordinary events e g storm hail high snow loads etc Ä Ä During the inspections it has to be c...

Page 11: ...lee 17 21 06766 Bitterfeld Wolfen Germany TEL 49 0 34946699 23222 FAX 49 0 34946699 23000 EMAIL sales q cells com WEB www q cells com Subject to change without notice Q CELLS Installation manual solar modules Q PEAK DUO G6 X _2019 06_Rev01_EN ...

Reviews: