INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO-G6.X+ – Q CELLS

INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO-G6.X+ – Q CELLS

Installation Site

Please note the following guidelines that apply to the installation 
site:

• 

The modules have been tested according to IEC 61215.

• 

Solar modules are not explosion-proof and are not suitable 
for use in explosive environments.

 

Ä

Do not operate solar modules near highly flammable gas and 
vapors (e.g. gas tanks, gas stations).

 

Ä

Do not install modules in enclosed space.

 

Ä

Do not install modules in locations where they may be sub-
merged in water (e.g. floodplains).

 

Ä

Do not use modules as a substitute for the normal roofing 
(e.g. modules are not watertight).

 

Ä

Do not install modules in close proximity to air conditioning 
systems.

 

Ä

Do not install modules above 4,000 m (13120 ft) altitude 
above sea level.

 

Ä

In locations with increased salt content in the air (e.g. close to 
the sea) special precautions must be taken (see „Grounding“ 
and „Maintenance and Cleaning“).

 

Ä

Do not bring any chemical substance (e.g. oil, solvent etc.) 
into contact with any part of the panel. Only substances, 
which are released by Q CELLS, are allowed to be used during 
installation, operation and maintenance.

 

Ä

Any installation of modules on surfaces of water is prohibited. 
This includes installations on floating as well as pile-based 
platforms. Q CELLS may extend the coverage of its warranty 
to such installations, based on a case by case assessment of 
the system design and location. A prior written consent by 
the warrantor is required in any case.

The solar modules are designed for the following applications:

• 

Operating temperatures from –40 °C to +85 °C 

 

(–40 °F  to  +185 °F). 

• 

Pull loads up to max. 4,000 Pa and push loads up to max. 
5,400 Pa (see chapter „Mounting Options“).

• 

Installation using a mounting structure for solar modules.

Prevention of Shadowing Effects

Optimal solar irradiation leads to maximum energy output:

 

Ä

For this reason, install the modules so that they face the sun. 

 

Ä

Avoid shadowing (due to objects such as buildings, chimneys 
or trees).

 

Ä

Avoid partial shading (for example through overhead lines, 
dirt, snow).

Mounting Structure Requirements

The Modules shall be installed and operated on mounting structures 
that comply with any applicable laws and stipulations as well as 
with the following:

• 

Conform to the necessary structural requirements.

• 

Compliant with local snow and wind loads.

• 

Properly fastened to the ground, the roof, or the façade.

• 

Forces acting on the module are relayed to the mounting 
substructure.

• 

Ensures sufficient rear ventilation of the module. 

• 

Avoid the usage of different metals to prevent contact corrosion.

• 

Allows for stress-free expansion and contraction due to 
temperature fluctuations.

 

Ä

Ensure that no additional forces are applied through the 
mounting system into the module except for the wind and 
snow loads. Additional forces and moments of torque at the 
mounting positions caused by torsions, displacements or 
vibrations in the mounting system are not allowed.

 

Ä

Ensure that the clamps and the mounting frame are com-
patible.

Clamp System Requirements

Use customary clamps that satisfy the following requirements:

• 

Clamp  width:  ≥ 40 mm.

• 

Clamp height compliant with a 32 mm frame height.

• 

Clamp depth: 7-12 mm. (applicable for all CL clamping mounting 
options at section „2.3 Mounting Options“)

• 

Clamps are not in contact with the front glass.

• 

Clamps do not deform the frame.

• 

Clamps that satisfy the structural requirements of the installation 
site.

• 

Long-term stable clamps that securely affix the module to 
the mounting frame.

Module Orientation Requirements

• 

Vertical or horizontal installation is permitted.

 

Ä

Ensure that rain and melting snow can run off freely. No water 
accumulation.

 

Ä

Ensure that the drainage holes in the frame are not covered. 
No sealing.

75°

 

Ä

Maintain the permissible angle of inclination.

• 

Minimum angle of inclination: 3°

• 

Inclination angles above 75° may be limited 
by local regulations

 

Ä

≥ 20°: self-cleaning effect 

 

Ä

Follow the directions for installation angles < 5° 
(„Grounding“, page 18) 

Fig. 2: 

Installation options for crystalline Q CELLS modules. All dimensions are given in mm. Also observe the maximum  
 test loads and clamping range as specified on the following page. 
 The illustrated installation options apply for both horizontal and vertical module orientation. 

 

Module 

Clamp 

Subconstruction 

Mounting profile

TYPE OF 
INSTALLATION

MODULE

POINT MOUNTING SYSTEM

LINEAR MOUNTING SYSTEM

INSTALLATION 
WITH CLAMPS

Q.PEAK DUO-G6
Q.PEAK DUO-G6+
Q.PEAK DUO BLK-G6
Q.PEAK DUO BLK-G6+

HYBRID  
CLAMPING

Q.PEAK DUO-G6
Q.PEAK DUO-G6+
Q.PEAK DUO BLK-G6
Q.PEAK DUO BLK-G6+

INSTALLATION  
ON MOUNTING  
POINTS

Q.PEAK DUO-G6
Q.PEAK DUO-G6+
Q.PEAK DUO BLK-G6
Q.PEAK DUO BLK-G6+

INSTALLATION 
WITH INSERTION 
PROFILES

Q.PEAK DUO-G6
Q.PEAK DUO-G6+
Q.PEAK DUO BLK-G6
Q.PEAK DUO BLK-G6+

NOT PERMITTED

2  PLANNING

2.2  REQUIREMENTS

2  PLANNING

2.3  MOUNTING OPTIONS

300 - 450

EUROPE

0 - 250

CL5

CL2a

0 - 300

CL2b

0 - 300

0 - 300

CL2a

0 - 300

CL2b

CL2a

0 - 200

CL2b

0 - 200

IP1

IP2

IP1

IP2

IP1

IP2

IP1

IP2

CL2a

0 - 300

CL2b

0 - 300

0 - 300

CL2a

0 - 300

CL2b

CL2a

0 - 200

CL2b

0 - 200

EN

4 × Mounting 
points

380

FB2

EN

4 x Mounting 
points

380

FB1

CL1

0 - 250

250 - 450
450 - 550

0 - 200

200 - 350
350 - 450

EUROPE
ASIA

CL1

CL3

CL4

250 - 450

200 - 350

0 - 300

0 - 300

CL3

CL4

CL4

0 - 200

ROW

Summary of Contents for Q.PEAK DUO BLK-G6

Page 1: ...INSTALLATION AND OPERATION MANUAL Q PEAK DUO G6 X solar module series Valid for Africa Europe LatinAmerica South America ...

Page 2: ...ssure equipment operational safety hazardous goods and environmental protection Regulations and requirements specific to the system Any applicable laws and requirements in particular inter national country specific regional laws and stipulations governing the planning installation and operation of solar power systems and work on roofs Any valid international national and regional regulations gover...

Page 3: ...ionsandpermitrequirements prior to installation of the solar power system Your financial success depends on the fulfillment of these requirements Other applicable documents In addition to this Manual following technical information are relevant DOCUMENT TYPE Product data sheet Packaging and transport information Fig 1 External dimensions and components for Q PEAK DUO G6 Q PEAK DUO G6 Q PEAK DUO BL...

Page 4: ...tructure Ensures sufficient rear ventilation of the module Avoid the usage of different metals to prevent contact corrosion Allows for stress free expansion and contraction due to temperature fluctuations Ä Ä Ensure that no additional forces are applied through the mounting system into the module except for the wind and snow loads Additional forces and moments of torque at the mounting positions c...

Page 5: ...ws and washers diameter 15 8mm or 0 62in for FB1 and FB2 mounting Module Selection Fordetailedkeyelectricaldata pleaserefertotheactualdatasheet referring to the relevant Module available at www q cells com Ä Ä For maximum energy yields mismatches of specified electric current IMPP ofmorethan5 shouldbeavoidedforallmodules connected in series Safety Factor During normal operation a module may genera...

Page 6: ...ot install damaged modules Ä Ä Inform your distributor of any damages immediately Note Module damage may occur Ä Ä Do not stack modules Note Module damage may occur Ä Ä Do not install modules near flammable gas vapors Ä Ä Do not install modules in close proximity to air conditioning systems Note Module damage may occur Ä Ä Do not drop modules Note Module damage may occur Ä Ä Only make modification...

Page 7: ...shock Ä Ä Only use dry insulated tools Ä Ä Do not carry out the installation alone Only install undamaged modules and components Ä Ä Do not modify the module e g do not drill any additional holes 3 INSTALLATION 3 2 PREPARATION OF INSTALLATION Option 1 Ä Ä Fasten the module with 4 clamps in the specified clamping range see Fig 2 p 7 Ä Ä Tighten clamps according to manufacturer s instructions Ä Ä Ma...

Page 8: ...ervals specified by the inverter manufacturer after switching off the inverter Ä Ä Make sure that the plugs can not be connected unintentionally Ä Ä Beforeworkingonthecontacts checkthemforsafetyextra low voltage Danger Risk of fatal injury due to electric shock Ä Ä Never open the junction box Ä Ä Do not remove bypass diodes Danger Risk of fatal injury due to electric shock Ä Ä Never touch live con...

Page 9: ...geous to rotate some modules 180 Ä Ä Module orientation can clearly be identified from the front side by the serial number and barcode labelled behind the module glass on the side with negative connection cable EN Inverter 180 180 SOLAR Ä Ä Ensure that all necessary safety and functional tests have been carried out according to applicable standards Note Module damage may occur Ä Ä Ensure that the ...

Page 10: ...tified personnel Ä Ä The time intervals and extent of the inspection can depend on local circumstances e g salt ammonia content in the air high humidity etc The customer operator must inform himself about time intervals and extend of necessary inspections Ä Ä Inspectionshavetobeperformedespeciallyafterextraordinary events e g storm hail high snow loads etc Ä Ä During the inspections it has to be c...

Page 11: ...lee 17 21 06766 Bitterfeld Wolfen Germany TEL 49 0 34946699 23222 FAX 49 0 34946699 23000 EMAIL sales q cells com WEB www q cells com Subject to change without notice Q CELLS Installation manual solar modules Q PEAK DUO G6 X _2019 06_Rev01_EN ...

Reviews: