INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO XL-G11.3_G11.7 – Q CELLS

INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO XL-G11.3_G11.7 – Q CELLS

Installation Site

Please note the following guidelines that apply to the installation 
site:

• 

Solar modules are not explosion-proof and are not suitable 
for use in explosive environments.

 

Ä

Do not operate solar modules near highly flammable gas and 
vapors (e.g. gas tanks, gas stations).

 

Ä

Do not install modules in enclosed space.

 

Ä

Do not install modules in locations where they may be sub-
merged in water (e.g. floodplains).

 

Ä

Do not use modules as a substitute for the normal roofing 
(e.g. modules are not watertight).

 

Ä

Do not install modules in close proximity to air conditioning 
systems.

 

Ä

Do not install modules above 4,000 m (13,120 ft) altitude 
above sea level.

 

Ä

Contact with saline water (e.g. spray water from the sea) and 
salt aggregation on the modules must be avoided.

 

Ä

Do not bring any chemical substance (e.g. oil, solvent etc.) 
into contact with any part of the panel. Only substances, 
which are released by Q CELLS, are allowed to be used during 
installation, operation and maintenance.

 

Ä

Any installation of modules on surfaces of water is prohibited. 
This includes installations on floating as well as pile-based 
platforms. Q CELLS may extend the coverage of its warranty 
to such installations, based on a case by case assessment of 
the system design and location. A prior written consent by 
the warrantor is required in any case.

The solar modules are designed for the following applications:

• 

Operating temperatures from –40 °C to +85 °C 

 

(–40 °F  to  +185 °F).

• 

Pull loads up to max. 2,400 Pa and push loads up to max. 
5,400 Pa (Test-load in accordance with IEC 61215, see chapter 
„Mounting Options“).

• 

Installation using a mounting structure for solar modules.

Prevention of Shadowing Effects

Optimal solar irradiation leads to maximum energy output:

 

Ä

For this reason, install the modules so that they face the sun.

 

Ä

Avoid shadowing (due to objects such as buildings, chimneys 
or trees).

 

Ä

Avoid partial shading (for example through overhead lines, 
dirt, snow).

Mounting Structure Requirements

The Modules shall be installed and operated on mounting structures 
that comply with any applicable laws and stipulations as well as 
with the following:

• 

Conform to the necessary structural requirements.

• 

Compliant with local snow and wind loads.

• 

Properly fastened to the ground, the roof, or the façade.

• 

Forces acting on the module are relayed to the mounting 
substructure.

• 

Ensures sufficient rear ventilation of the module.

• 

Avoid the usage of different metals to prevent contact corrosion.

• 

Allows for stress-free expansion and contraction due to 
temperature fluctuations.

 

Ä

Ensure that no additional forces are applied through the 
mounting system into the module except for the wind and 
snow loads. Additional forces and moments of torque at the 
mounting positions caused by torsions, displacements or 
vibrations in the mounting system are not allowed.

 

Ä

Ensure that the clamps and the mounting frame are com-
patible.

Clamp System Recommendations

Use customary clamps that satisfy the following requirements:

• 

Clamp  width:  ≥ 38 mm.

• 

Clamp height compliant with a 35 mm frame height.

• 

Clamp depth: 5-12 mm. (applicable for all CL and TC clamping 
mounting options at section „2.3 Mounting Options“)

• 

Clamps are not in contact with the front glass.

• 

Clamps do not deform the frame.

• 

Clamps that satisfy the structural requirements based on the 
conditions of the installation site according to the applicable 
regulations and technical standards.

• 

Long-term stable clamps that securely affix the module to 
the mounting frame.

Module Orientation Requirements

• 

Vertical or horizontal installation is permitted.

 

Ä

Ensure that rain and melting snow can run off freely. No water 
accumulation.

 

Ä

Ensure that the drainage holes in the frame are not covered. 
No sealing.

75°

 

Ä

Maintain the permissible angle of inclination.

• 

Minimum angle of inclination: 3°

• 

Inclination angles above 75° may be limited 
by local regulations

 

Ä

Standing water on the modules glass needs to 
be avoided. 

2  PLANNING

2.2  REQUIREMENTS

Fig. 2: 

Installation options for crystalline Q CELLS modules. All dimensions are given in mm. Also observe the maximum 
 test loads and clamping range as specified on page 9. 
 The illustrated installation options apply for both horizontal and vertical module orientation. 

 

Module 

Clamp 

Subconstruction 

Mounting profile

TYPE OF INSTALLATION

MODULE

POINT MOUNTING SYSTEM

INSTALLATION 
WITH CLAMPS

Q.PEAK DUO XL-G11.3
Q.PEAK DUO XL-G11.7

INSTALLATION 
ON MOUNTING 
POINTS

Q.PEAK DUO XL-G11.3
Q.PEAK DUO XL-G11.7

2  PLANNING

2.3  MOUNTING OPTIONS

FB1

4 × mounting 
points

508

CL1a

450 – 550

Summary of Contents for Q.ANTUM DUO Z Series

Page 1: ...INSTALLATION AND OPERATION MANUAL Q PEAK DUO XL G11 3 and Q PEAK DUO XL G11 7 solar module series Valid for Africa Europe LatinAmerica South America...

Page 2: ...applicable stipulations such as country specific regulations for pressure equipment operational safety hazardous goods and environmental protection Regulations and requirements specific to the system...

Page 3: ...able documents In addition to this Manual following technical information are relevant DOCUMENT TYPE Product data sheet Packaging and transport information MISUSE OR INCORRECT USE OF SOLAR MODULES VOI...

Page 4: ...ulations as well as with the following Conform to the necessary structural requirements Compliant with local snow and wind loads Properly fastened to the ground the roof or the fa ade Forces acting on...

Page 5: ...t is met In order to limit reverse currents that may occur we recommend using the following safety options 1 Layout with a limited number of parallel connected strings Withoutundertakingfurthercurrent...

Page 6: ...electric shock Do not install damaged modules Inform your distributor of any damages immediately Warning Fire Risk Do not install modules indoors Do not install modules on moving objects Note Module d...

Page 7: ...t weather Danger Risk of fatal injury due to electric shock Only use dry insulated tools Do not carry out the installation alone Only install undamaged modules and components Do not modify the module...

Page 8: ...serve the time intervals specified by the inverter manufacturer after switching off the inverter Make sure that the plugs can not be connected unintentionally Beforeworkingonthecontacts checkthemforsa...

Page 9: ...n the same string Ensure for a tight connection between the plugs Plugs click together audibly click click click click Danger Risk of fatal injury due to electric shock Ensure that all electrical comp...

Page 10: ...that have cooled down Do not carry or wear any electrically conductive parts WARNING Risk of falling due to unsecured access Never access the installation area alone or without taking adequate securi...

Page 11: ...21 06766 Bitterfeld Wolfen Germany TEL 49 0 34946699 23222 FAX 49 0 34946699 23000 EMAIL sales q cells com WEB www q cells com Subject to change without notice Q CELLS Installation manual solar modul...