background image

 

  23  / 38 

EU20PIXV0501 

and the 6

th

 bit dial switch support a 120

Ω

 resistance (

Terminal Resistance

). 

 
ADD  Switch  MBMS  is  a  6  bit  dial  switches  to  manually  distribute  the 
communication  address  of  the  battery  system.  Nether  position  is  OFF, 
means “0”. Upper position is ON, means “1”. 1st bit to 4th bit is for address, 
the  5th  and  the  6th  bit  dial  switch  support  a  120

Ω

  resistance  (Terminal 

Resistance). 
 

 
3.6.3.1    Under communication for single BMS (battery string qty. 1 set)   

The BMS’s first five bits must set in below <

BMS’s Address Configure Table

>. The last BMS’s terminal 

resistance must set in “1” (X=1); 

The address is configured follow ASCII code: (“X” is terminal resistance).   
BMS’s Address Configure Table: 

 

 

3.6.3.2    Under CAN Communication Mode between MBMS and BMS (battery string qty. 

6 set)   

The  BMS’s  first  five  bits  must  set  in  below  <

BMS’s  Address  Configure 

Table

>. The last BMS’s terminal resistance must set in “1” (X=1), and other 

BMS’s terminal resistance must set in “0”.   

The address is configured follow ASCII code: (“X” is terminal resistance).   

BMS’s Address Configure Table:

   

The  MBMS’s  ADD  Switch  set  with  “000011”.  The  last  2  bits  are  terminal 
resistances.   
Note: the 1

st

 to 4

th

 bit dial for MBMS refer to 3.6.3.3 

 
 
 
 

3.6.3.3    Multi MBMS Communication Mode 

In some project it configures multi Energy Storage Systems. In this case 
will have multi MBMS. The address of MBMS must follow <MBMS’s Address 
Configure Table>   
 
 
 
 

CAN

Modbus

Address dial bit

0

1

00000X

1

1

10000X

2

2

01000X

3

3

11000X

4

4

00100X

5

5

10100X

6

6

01100X

Battery

String

Address Bit

Battery

String

Address Bit

Battery

String

Address Bit

Battery

String

Address Bit

1

10000X

9

10010X

17

10001X

25

10011X

2

01000X

10

01010X

18

01001X

26

01011X

3

11000X

11

11010X

19

11001X

27

11011X

4

00100X

12

00110X

20

00101X

28

00111X

5

10100X

13

10110X

21

10101X

29

10111X

6

01100X

14

01110X

22

01101X

30

01111X

7

11100X

15

11110X

23

11101X

31

11111X

8

00010X

16

00001X

24

00011X

32

00000X

Summary of Contents for PowerCube-X1

Page 1: ...Lithium Ion Phosphate Energy Storage System PowerCube X1 X2 Operation Manual Information Version V2 4 EU20PIXV0501...

Page 2: ......

Page 3: ...gram 13 2 3 1 Multiple battery string parallel connection via CAN communication between MBMS and BMS diagram battery string qty 6 sets 13 2 3 2 Diagram between BMS and battery modules 14 3 INSTALLATIO...

Page 4: ...4 System turns on 24 3 6 5 System turns off 26 3 SYSTEM DEBUG 28 4 MAINTENANCE 29 5 1 Trouble Shooting 29 5 2 Replacement of main component 31 5 2 1 Replacement of Battery Module 31 5 2 2 Replacement...

Page 5: ...ectrical system as well as the dealing with hazards l Knowledge of the manual and other related documents l knowledge of the local regulations and directives 1 1 Symbol Danger Lethal voltage l Battery...

Page 6: ...tive and negative Symbol in label Do not place near open flame Symbol in label Do not place at the children and pet touchable area Symbol in label Recycle label Symbol in label Label for Waste Electri...

Page 7: ...ptimum temperature 18 28 Out of the working temperature range may cause the battery system over low temperature alarm or protection which further lead to the cycle life reduction as well as It will af...

Page 8: ...of 48 With SC0500 40 controller zzz 96 480 in step of 48 With SC0500 100 controller Product Name LFP Lithium Ion Energy Storage System LFP Lithium Ion Energy Storage System Cell Technology Li iron LFP...

Page 9: ...I Efficiency 96 96 Depth of Discharge 90 90 Dimension W D H mm 600mm W 505mm D 1300mm H where n 2 8 or 600mm W 505mm D 2130mm H where n 2 10 600mm W 505mm D 1300mm H where n 2 8 or 600mm W 505mm D 213...

Page 10: ...2 10 54 n where n 2 10 Battery System Charge Current Standard 14 8 14 8 Battery System Charge Current Normal 37 37 Battery System Charge Current Max 37 74 Battery System Discharge lower Voltage Vdc 4...

Page 11: ...acity AH 50 Battery Module Quantity pcs 30 Battery Cell Voltage Vdc 3 2 Battery Cell Capacity AH 25 Battery Module Cell Quantity in Series pcs 15 Battery Module Charge Voltage Vdc 54 Battery System Ch...

Page 12: ...Battery Module Charge Current Standard A 14 8 Battery Module Charge Current Normal A 37 Battery Module Charge Current Max A 74 Battery Module Discharge lower Voltage Vdc 43 5 Battery Module Discharge...

Page 13: ...ervice Link Port 0 1 Link Port 0 1 Communication Terminal for communication between multiple serial battery modules and control module Power Terminals Power cable terminals there are two pair of termi...

Page 14: ...Current Max A 40 100 5 Discharge Voltage Vdc 60 600 60 600 6 Discharge Current Max A 40 100 7 Self consumption Power W 8 8 8 Dimension W D H mm 442 270 87 442 390 132 9 Communication Modbus RTU CAN M...

Page 15: ...this button to restart the battery system ADD ADD Switch is a 6 bit dial switches to manually distribute the communication address of the battery system Nether position is OFF means 0 Upper position i...

Page 16: ...ANH 5 CANL 6 GND RX 7 RS485A 8 RS485B GND 12VDC Output Terminal Power supply for 3rd level control module with 12VDC cable Status Status light to show the battery module s status RUN Alarm and Protect...

Page 17: ...ff Off Indicate based on capacity Indicate based on capacity Alarm Off Light Off Protection Off Off Light Stop discharging PRC lighting Abnormal Protection Off Off Light Off Off Off Off Stop charging...

Page 18: ...EU20PIXV0501 14 38 Diagram between BMS and battery modules 2 3 2...

Page 19: ...w Driver Adjustable Wrench Sleeve Piece 1000VDC Multimeter NOTE Use properly insulated tools to prevent accidental electric shock or short circuits If insulated tools are not available cover the entir...

Page 20: ...ery system over low temperature alarm or protection 3 3 3 Cooling System The room must be equipped with cooling system Caution Out of the working temperature range may cause the battery reduces the cy...

Page 21: ...ion Orange 0 16m 4AWG 2 Orange Surlok Terminal 1pcs module Power Cable Battery Module and Main Controller Serial Connection Black 2m 4AWG 2 Black Surlok Terminal 1pcs system Power Cable Battery Module...

Page 22: ...rnal Power Cable Orange 2m 4AWG SURLOK Terminal 25 8 Terminal pcs 1 External Power Cable Black 2m 4AWG SURLOK Terminal 25 8 Terminal pcs 1 For SC0500 40 control module External Power Cable Black Red 2...

Page 23: ...f the battery module Single battery module is 24 32kg If without handling tools must have more than 1 man to handling with it 3 5 2 Handling and placement of the rack If without handling tools must ha...

Page 24: ...stall the buckle nuts The position of nuts must meet the position of the MBMS l Install the MBMS in Uses 4 screws to fix 3 6 Cables connection 3 6 1 Grounding connection Danger The battery system is h...

Page 25: ...the container Then through the grounding of the container to ensure reliable grounding The cable shall be copper with yellow green color If want to connect the ground cable it can be connected to the...

Page 26: ...unication Mode between MBMS and BMS Cable Diagram Note The 1st PowerCube X1 X2 should be installed nearest to the MBMS 3 6 3 ADD Switch Setting Address Assignment ADD Switch BMS is a 6 bit dial switch...

Page 27: ...ion Mode between MBMS and BMS battery string qty 6 set The BMS s first five bits must set in below BMS s Address Configure Table The last BMS s terminal resistance must set in 1 X 1 and other BMS s te...

Page 28: ...ish Warning The external switch or breaker between PCS and battery string must be off before the battery system power on System turns on step 1 Switch the external power or inverter PCS on to make sur...

Page 29: ...s activated within 30s for 10min If MBMS is using internal power supply from BMS please first use black start function to provide power supply to MBMS for further establish the external communication...

Page 30: ...External device should communicate with battery system through LAN CAN or RS485 Otherwise maybe cause battery system work abnormal Caution During first time power on the system will require to do full...

Page 31: ...as the other modules in the system Otherwise system needs long time to do the balance for such replacment module Warning Do not turn off the Power Switch during normal running condition Otherwise wil...

Page 32: ...n the BESS system and communicated devices normal or not has alarm or not Power Conversion System Test Before conjoint test must test the Inverter System turn on progress at first And check the parame...

Page 33: ...l The control board is failure l Change the control module BMS module 3 Turn on the BMS The Status LED is lighting red But all battery modules status LED is lighting green l This battery string is un...

Page 34: ...D shows normal But the output relay can t be actuation l The wire of the output relay or the wire of the power relay switch in the BMS is broken l Power Relay Switch is open l Check the wire got loose...

Page 35: ...are without power The turn off progress refer to chapter 3 6 5 5 2 1 3 Pull out the Plug of Power Cable Pull out the plug of communication cable Danger the power cables and plugs still have high volta...

Page 36: ...ower cables still have high voltage DC power from another battery modules must be careful to handle the Power plugs 5 2 2 3 Dismantle the 4 screws of the battery module s front face 5 2 2 4 Install th...

Page 37: ...SOC Inspection Periodical Maintenance Check the SOC of battery system through the monitor system Check the battery string abnormal SOC or not 5 3 3 Cables Inspection Periodical Maintenance Visual insp...

Page 38: ...he system every 6 months 5 3 8 Recycle NOTE Damaged batteries may leak electrolyte or produce flammable gas In case a damaged battery needs recycling it shall follow the local recycling regulation ie...

Page 39: ...and charge interval shall not exceed 6 months Caution If not follow the above instructions for long term store the battery The cycle life will have relative heavily reduction 6 Shipment Battery module...

Page 40: ...EU20PIXV0501 36 38 Annex 1 Cable connection diagram...

Page 41: ...et up ADD switch of every BMS and the MBMS Address Assignment Refer to chapter 3 6 3 9 Connect external communication cables from BMS to BMS MBMS inverter PCS or another Refer to chapter 3 6 2 10 Conn...

Page 42: ...ation The first installation should do full charging progress Annex 3 System Turn OFF Progress List Tick after completion No Item Remark 1 Soft off the PCS through PCS s control panel Refer to chapter...

Page 43: ......

Page 44: ...Pylon Technologies Co Ltd No 73 Lane 887 ZuChongzhi Road Zhangjiang Hi Tech Park Pudong Shanghai 201203 China T 86 21 51317699 F 86 21 51317698 E service pylontech com cn W www pylontech com cn...

Reviews: