Nixie Tube Clock ‘Nixie QTC’
Issue 10a (21 March 2014)
www.pvelectronics.co.uk
- 41 -
8.
MOUNTING THE RGB TUBE LIGHTING COMPONENTS
Complete step 8 if you have selected the optional RGB Tube
Lighting Pack. Alternatively, you may choose to install a single
colour LED (Step 9), or no LEDs at all.
8.1 RGB LEDs D8 – D13.
Q2 – Q4 (2N7000)
R31 – R36 (270 Ω)
Retrieve the 6 LEDs from earlier, complete with light pipes:
Install an LED at each LED location, looking carefully for the
‘notched’ corner on each LED which is partially masked by the heat
shrink, but still visible. This aligns with a corresponding PCB mark .
Solder in each LED and then the other components of this step: