SOLAR BOLT INSTALLATION GUIDE
Step 1: Route main harness back
toward the liftgate batteries.
Secure with wire ties or cable
clamps as you go.
Step 2: Once the cable is routed to
the battery box, feed the Solar Bolt
main harness into the battery box
through a dome nut or a grommet.
DO NOT cut the harness until the
mounting location for the Solar
Bolt controller is determined.
CABLE ROUTING
Installation Complete
Important: Place the supplied cable clamps along the 2-conductor jacketed
cable every 18 inches to ensure proper support for the cable. Avoid sharp
edges and possible chaffing points.