![Purkeys SOLAR BOLT Installation Manual Download Page 12](http://html1.mh-extra.com/html/purkeys/solar-bolt/solar-bolt_installation-manual_1628050012.webp)
10
Step 1: Mount the Solar Bolt
controller to the liftgate battery
box by using the supplied #12 ¾”
hex tek screws.
Step 2: Determine the appropriate
amount of cable needed to make
the connections to the Solar Bolt
controller, then cut excess cable.
Strip off jacketed insulation from
the Solar Bolt main harness to
approximately 2 inches. Strip the
insulation on both wires.
Step 3: Connect the blue wire from
the Solar Bolt main harness to the
wire on the Solar Bolt controller
labeled SOLAR POSITIVE. Solder
and heat shrink.
SOLAR BOLT CONTROLLER INSTALLATION