10
5. WARNINGS
The domestic systems of the PROLINE PLUS series, ARE NOT
water PURIFIERS.
Should the water to be treated come from a public water supply (and as
such complies with the legislation in force European Directive 98/83/EC),
the domestic systems of the PROLINE PLUS series, significantly improve
the quality of the water.
agua.
Should the water to be treated not come from a public water supply,
that is, from an unknown source, a physical-chemical and bacterial
analysis of the water shall be necessary, with the objective of ensuring its
proper purification applying the proper techniques and systems appropriate
for each case, PRIOR TO THE INSTALLATION of the system.
Contact your distributor in order to obtain advice about the most appropriate
treatment for you.
5.1 Conditions for the proper working of the system
• Do not use hot water in the system (T > 40 ºC).
• The room temperature must be between 4 ºC and 45 ºC.
• The PROLINE PLUS PUMP series system incorporates
a pump. Should the system pressure be superior to 3 bars, a
plessure regulator should be attached prior to water entering the
system, set at a maximum pressure of 2.5 bars. (Ref. 577603).
• There is no pump incorporated into the PROLINE PLUS series
system. The installation of a system without pump is recom-
mended when the system pressure is higher than 3 bars.
• For water with a salt content higher than 2000 ppm contact
your distributor.
• It is recommended that you soften the water to be treated
or that has a maximum hardness of 15 ºF with the objective of
obtaining the optimum performance of the system.
• Should the water to be treated have a level of hardness superior
to 15 ºF, the life of the membrane may be reduced and also the
performance of the system. It is recommended that you brush the
membrane for 15 seconds once a day (Read section 9.3
Flush-
ing
, which describes how it should be carried out).
• Should the water to be treated contain:
· high concentrations of iron and magnesium (higher than 1 ppm
on average in the rejection of the machinery),
· prolonged hyperchlorisations.
· sludge or turbidity superior to 3 NTUs,
· a concentration of nitrates superior to 100 ppm.
· a concentration of sulphates superior to 250 ppm,
· contact your distributor so that they can recommend the most
appropriate pre-treatment for you, and as such ensure the
proper working of the machine, avoid damage to components
and guarantee the quality of the water supplied.
4. Unpackaging and verification of contents
5.
Warnings
In order to obtain more information about how to dispose of your
electrical and electronic machine once they have fulfilled their
use, contact the local authorities, the management of urban
waste service or the establishment from which you acquired
the machine.
The proper collection and treatment of the machines that can
no longer be used, contributes to the preservation of natural
resources and also to avoiding potential public health risks.
Summary of Contents for PROLINE PLUS
Page 1: ...INSTRUCTIONS MANUAL PROLINE PLUS PROLINE PLUS PUMP ...
Page 3: ...3 ...
Page 27: ...27 ...