22
Installation & Operation Manual
Copyright © Puretec Pty Ltd 2022
6
Installation Procedure
Connecting The System
1. Refer to diagram (below) for correct plumbing of head. Cut the
inlet line as required to accommodate the inlet/outlet of the
neutraliser. ONLY use thread tape, as liquid sealants will cause
deterioration of the plastic. DO NOT OVERTIGHTEN.
2. After the valve has been connected, remove the fill-port cap using
the spanner provided. Add the neutralising media using a funnel
(see individual model specifications for filling order), ensuring that
it is no more than 2/3 full. Replace the fill-port cap.
Note:
Overfilling the tank can result in excess undissolved media
entering the line. You may have been supplied with more media than
required, retain this for future replenishing.
3. Adjust the bypass to allow water flow (refer to Page 13) and turn
the water supply back on.
4. The water will initially be ‘milky white’ in appearance. Flush the
water through the system until all the air in the lines is expelled,
or when the water runs clear.
5. Installation is now complete, and your system is ready for use.
Note:
The pH level can be adjusted using the mixing valve on NTX
models to achieve the desired level. If the pH is initially over corrected
this can be adjusted with a bypass valve by mixing untreated water
with treated water to achieve the desired level (if installed). Testing
can be done with a hand-held meter, Puretec PTE20 or similar (not
included).
Valve Identification
Outlet
(downflow inlet)
Inlet
(upflow inlet)
Refill Port
Blending Valve
(NTX models)
Summary of Contents for NTS Series
Page 28: ......