5
Copyright © Puretec Pty Ltd 2020
NTR-E3 User Guide
Before Installation
Professional Installation Required
•
Installation requires shutting water off to home, cutting home water supply pipe
and using a welding torch to add piping and fittings. Specialised tools and skills are
required, this must be completed by a qualified tradesperson.
Make Sure Your Water Has Been Thoroughly Tested
•
An analysis of your water should be made prior to the selection of your water
treatment equipment. Enter your analysis information on page 4 for your permanent
record.
Note:
If sulphate level is higher than the nitrate level, contact Puretec prior to
installation.
Install Water Conditioning Equipment Correctly
Select the location of your system with care. Various conditions which contribute to
proper location are as follows:
•
Install as close as possible to a drain.
•
Install in correct relationship to other water treatment equipment. Contact Puretec
for assistance.
•
Install the system in the supply line BEFORE the water heater. Temperatures above
43.3°C (110°F) will damage the unit and void the warranty.
•
DO NOT install the softener in a location where freezing temperatures occur.
Freezing may cause permanent damage and will also void the warranty.
•
DO NOT install where water hammer conditions may occur without installing an
arrestor.
•
Allow sufficient space around the installation for easy servicing. Provide a non-
switched 240V power source for the control valve.
Things to Remember While Planning Your Installation:
Before Installation
Summary of Contents for NTR-E3 Series
Page 24: ......