6
Installation & Operation Manual
Copyright © Puretec Pty Ltd 2018
Maintenance
Wall Mount Bracket
Filter Housing Head
O-Ring
Filter Housing Bowl
Housing Spanner
6 Hold bowl(s) upright while screwing onto head. Make certain that the spigot in the
housing head(s) is located centrally to the cartridge(s) to make a good seal. Hand
tighten bowl until firm. DO NOT OVER TIGHTEN.
7 Open downstream tap to allow air to be released and gently open water supply
allowing all air to be purged.
8 Allow water to run for 2 minutes to flush the system.
9 Close down stream tap and check for leaks. Flush system for 10 minutes after any
period of non-use more than 2 days. For a period of non-use of 2 weeks or more,
it may be necessary to replace the cartridge.
Replacement Parts List
Summary of Contents for EM1-60
Page 8: ......