Installation for PURE TECH 250
Page 28
Tech Support: 1-888-989-7873
PURE WATER TREATMENT, INC.
•
First turn water supply off.
•
Make a cut in your line AFTER your pressure tank.
•
Install first ball valve AFTER your pressure tank. (see figure a on page 3)
•
Teflon tape threads on each end of
PURE TECH 250.
•
Place rubber o-ring seal in notch then place adaptation cap and screw down tightly.
Securely tighten, but be careful not to strip the threads.
•
Install required plumbing bushings in
PURE TECH 250
that matches your pipe size.
•
Install
PURE TECH 250
after ball valve. With this installed you will be able to cut
the water supply off later to add chlorine.
•
Install spigot after the
PURE TECH 250
. This will allow you to de-pressurize the
unit.
•
Install second ball valve after spigot. This will allow you to stop the water from back
feeding from any equipment.
•
DO NOT INSTALL CHLORINE YET.
•
Go to Page 7 section 5 and continue with installation of
PURE TECH 3000si
Summary of Contents for PTSF-2510-10
Page 1: ...For Model PTSF 2510 10 PTSF 2510 13 Owners Manual Installation Instructions...
Page 16: ...Timer Assembly Tech Support 1 888 989 7873 PURE WATER TREATMENT INC Page 16...
Page 18: ...Control Valve Drive Assembly Tech Support 1 888 989 7873 PURE WATER TREATMENT INC Page 18...
Page 20: ...Control Valve Base Assembly Tech Support 1 888 989 7873 PURE WATER TREATMENT INC Page 20...