WARNING: READ AND FOLLOW THESE INSTRUCTIONS, PRIOR TO ASSEMBLY
AND USE OF THIS EQUIPMENT.
STEP 1 – BOTTOM FRAME AND SUPPORT ASSEMBLY
A. Connect 2x Bottom Rail (2) sections to-
gether. Compress the spring pins with your
thumb to allow the tubes to be inserted.
Repeat for the other 6x Bottom Rail (2)
sections as shown in Fig A. When com-
plete, make sure the sections are securely
connected with the spring pins fully extend-
ed through the housing holes.
B. Fit 8x Vertical Legs (3) over the Leg Sockets
in the Bottom Rail. Compress the spring pins
with your thumb to allow the tubes to be insert-
ed as shown in Fig B.
DO NOT FULLY INSERT VERTICAL LEG
TUBE(s)
C. Connect a Top Rail Section (1) with a
Vertical Leg (3).
DO NOT FULLY INSERT AND/OR LOCK
the Top Rail Section (1) onto the Vertical
Leg (3) with the spring pin connector yet.
DO NOT FULLY INSERT VERTICAL LEG
TUBE(s)
D. Take the remaining 7x Top Rail Sections
(1) and place on each Vertical Leg (3), while
inserting the tapered end into the next Top Rail,
as shown in Fig D.
DO NOT FULLY INSERT AND/OR LOCK ANY
of the Top Rail sections down onto the Vertical
Legs while you are completing this step.