![PUR2o Alkaline Plus Installation Instructions Manual Download Page 7](http://html1.mh-extra.com/html/pur2o/alkaline-plus/alkaline-plus_installation-instructions-manual_1626081007.webp)
Storage Tank Preparation
1 - Remove storage tank from its box, discard packing material.
2 - From parts bag locate: tank shut-off valve.
3 - Using Teflon tape (not included), wrap
¼
” male treads on storage tank using
clockwise motion.
4 - Install tank shut-off valve on storage tank as seen in figure “B”. Do this by hand
tightening valve clockwise onto male threads of storage tank.
5 - Slide tubing into tank shut-off valve.
OFF Position
ON Position
6 - Set aside until needed and proceed to drain connector installation.
Drain Connector Installation
1 - From parts bag locate BLACK DRAIN SADDLE VALVE connector
assembly and the WHITE FLOW RESTRICTOR.
2 - The drain saddle valve should be installed above the trap and
on the vertical or horizontal tail piece.
3 - The position of the hole on the pipe should be marked and drilled with a
¼
” bit
through only one side of the pipe.
4 - Align the drain saddle valve over drilled hole and attach it to the drainpipe and
tighten the two screws evenly.
5 - On the DRAIN
¼
” tubing, connect the FLOW RESTRICTOR by cutting the
¼
” tubing
(at about the half way point) with the ARROW pointing to the drain.
NOTE:
IF THE UNIT IS INSTALLED IN A PERMANENT HANGING POSITION, A
MINIMUM CLEARANCE OF 2” WILL BE REQUIRED TO ALLOW FILTER
REPLACEMENT.
Standard Installation
1 - Mark pilot holes for mounting unit 16” from base and 7” apart.
2 - Drill pilot holes using a
⅛
” drill bit, approximately
½
” deep.
3 - Set mounting screws with screwdriver, leaving a
¼
” gap between screw head and
mounting surface to allow bracket to slide on easily.
NOTE:
ALTERNATE FASTENING METHODS MAY BE REQUIRED FOR
PLASTERBOARD PARTICLE BOARD OR SIMILAR MATERIAL INSTALLATION.
-7-