PUR2o Alkaline Plus Installation Instructions Manual Download Page 7

Storage Tank Preparation

1 - Remove storage tank from its box, discard packing material.
2 - From parts bag locate: tank shut-off valve.
3 - Using Teflon tape (not included), wrap 

¼

” male treads on storage tank using 

clockwise motion.
4 - Install tank shut-off valve on storage tank as seen in figure “B”. Do this by hand 
tightening valve clockwise onto male threads of storage tank.
5 - Slide tubing into tank shut-off valve.

 
 

 

 

 

 

 

  

OFF Position

     

ON Position

6 - Set aside until needed and proceed to drain connector installation.

Drain Connector Installation  

1 - From parts bag locate BLACK DRAIN SADDLE VALVE connector                                
assembly and the WHITE FLOW RESTRICTOR.
2 - The drain saddle valve should be installed above the trap and                                      
on the vertical or horizontal tail piece.
3 - The position of the hole on the pipe should be marked and drilled with a 

¼

” bit 

through only one side of the pipe.
4 - Align the drain saddle valve over drilled hole and attach it to the drainpipe and 
tighten the two screws evenly.
5 - On the DRAIN 

¼

” tubing, connect the FLOW RESTRICTOR by cutting the 

¼

” tubing 

(at about the half way point) with the ARROW pointing to the drain.

NOTE:

  IF THE UNIT IS INSTALLED IN A PERMANENT HANGING POSITION, A 

MINIMUM CLEARANCE OF 2” WILL BE REQUIRED TO ALLOW FILTER 
REPLACEMENT.

Standard Installation

1 - Mark pilot holes for mounting unit 16” from base and 7” apart.
2 - Drill pilot holes using a 

” drill bit, approximately 

½

” deep.

3 - Set mounting screws with screwdriver, leaving a 

¼

” gap between screw head and 

mounting surface to allow bracket to slide on easily.

NOTE:

  ALTERNATE FASTENING METHODS MAY BE REQUIRED FOR 

PLASTERBOARD PARTICLE BOARD OR SIMILAR MATERIAL INSTALLATION.

-7-

Summary of Contents for Alkaline Plus

Page 1: ...for the reverse osmosis membrane Stage 2 Pre Carbon filter contains granular activated carbon to remove chlorine and other chemical contaminants protecting the Reverse Osmosis Membrane Stage 3 The Rev...

Page 2: ...e osmosis Membrane is changed every 3 years Quick Connect Secure Fittings 1 Confirm the tubing ends are cut squarely NOT at an angle and without burrs 2 Firmly insert the end of the tubing into the Qu...

Page 3: ...unit to the DRAIN SADDLE VALVE 2 From the T connection coming from the OUT port connect tubing to either WHITE PORT on the T connection to the shut off valve fitting on the Pressure TANK 3 From the T...

Page 4: ...nects the system to your cold water line under your sink This device will self pierce copper and plastic plumbing Drain Saddle Valve This connects to your drain plumbing and allows reject water flow t...

Page 5: ...ILL OR CORDLESS DRILL TO MAKE THE HOLE IF YOU USE AN ELECTRIC DRILL OUTLET MUST BE GROUNDED ALWAYS USE SAFETY GLASSES OR OTHER EYE PROTECTION WHEN DRILLING TO PREVENT POSSIBLE EYE INJURY FROM FLYING P...

Page 6: ...PEN END HARD PLASTIC WASHER LOCK NUT WAHER and HEX NUT onto the stem of the faucet Tighten securing the faucet to the sink counter top 3 In the PARTS bag take GRAY plastic Faucet Connector and screw i...

Page 7: ...horizontal tail piece 3 The position of the hole on the pipe should be marked and drilled with a bit through only one side of the pipe 4 Align the drain saddle valve over drilled hole and attach it t...

Page 8: ...tart Up 1 Turn on cold water supply 2 Make sure the tank ball valve is in the OFF position 3 Turn ON dedicated faucet wait until the water flows to a steady trickle 4 Turn off the faucet this will all...

Page 9: ...or temperatures can reduce production rate Add pressure to storage tank The pressure should be 5 7 psi when the tank is empty Slow production Low water pressure Crimps in tubing Clogged pre filters F...

Reviews: