![PUR2o Alkaline Plus Installation Instructions Manual Download Page 2](http://html1.mh-extra.com/html/pur2o/alkaline-plus/alkaline-plus_installation-instructions-manual_1626081002.webp)
Options
The system comes with a selection of options:
·
Faucet finish - chrome or brushed-nickel
·
Pressure tank - 2 gallon, 3G, 10G, 14G and 20G Pressure Tank
Service of the system
The filters in the Reverse Osmosis Box Assembly - sediment, pre-carbon and post-
carbon or 3-Pack must be replaced once a year. The PH Booster and Ionizer needs
replacement every 2-years. The Reverse osmosis Membrane is changed every 3-
years.
Quick Connect & Secure Fittings
1 – Confirm the tubing ends are cut squarely – NOT at an angle and without burrs.
2 – Firmly insert the end of the tubing into the Quick Connect Fitting until the tubing
bottoms. The tubing will insert into the fitting approximately
⅝
of an inch.
3 – To remove the tubing from the Quick Connect Fitting, press firmly and evenly on the
protruding collet with your fingers. The gripping mechanism will release and the tubing
may be withdrawn.
-2-
Simply push in tube to attach
!
!
!
Push in collet to release tube