
Page
18
Air (dB) transducers should be installed and connected in accordance
with the installation instructions contained in the dB Transducer User
Guide.
Wall mount unit
Locating the Sludge Finder 2 unit
The unit may be located inside a building or it may be field-mounted.
Locate the unit so that the maximum cable length to any transducer does
not exceed 200m.
Avoid locating the processor near variable frequency drives or other
high voltage equipment or cables.
Ensure that the
Sludge Finder 2
controller is installed in a “Safe”, non-
hazardous, area.
For a clear view of the LCD display it is recommended that it is
mounted at eye level.
Ensure the mounting surface is vibration-free and the ambient
temperature is between -20ºC and 50ºC.
Installing the controller
Mount the unit at a convenient height for viewing the control panel and
displays. Allow sufficient clearance around the unit for the door to
swing fully open for instrument service.
Secure to a wall or panel using the mounting holes. Alternatively, attach
to a local handrail using the optional Integrator Mounting Assembly.
Summary of Contents for SLUDGE FINDER 2
Page 1: ...SLUDGE FINDER 2 INSTRUCTION MANUAL ...
Page 2: ......
Page 4: ......
Page 13: ...Page 7 EC Declaration of Conformity ...
Page 14: ...Page 8 This page left blank intentionally ...
Page 18: ...Page 12 The full dimensions of the enclosure are as shown below ...
Page 25: ...Page 19 ...
Page 29: ...Page 23 Transducer Installation Options 1 Stainless steel mounting plate Fig 1 ...
Page 42: ...Page 36 Enclosure Dimensions ...
Page 45: ...Page 39 Receiver and Transmitter Dimensional Details ...
Page 70: ...Page 64 This page left blank intentionally ...
Page 94: ...Page 88 This page left blank intentionally ...
Page 132: ...Page 126 This page is left blank intentionally ...