background image

 

 
Before installation, prepare a Switch'a load balance.  

 
The given value of 30 W per port is the maximum value referring to a single output. The total power consumption 

should not exceed 48 W when all PoE ports are being used

. The increased demand for power is particularly evident in the 

case of cameras with heaters or infrared illuminators - when launching these features, the power consumption increases rapidly, 
which  may  adversely  affect  the  operation  of  the  switch.  As  the  device  is  designed  for  a  continuous  operation  and  is  not 
equipped  with  a  power-switch,  therefore  an  appropriate  overload  protection  shall  be  guaranteed  in  the  power  supply  circuit. 
Moreover, the user shall be informed about the method of unplugging (usually through assigning an appropriate fuse in the fuse-
box). The electrical system shall follow valid standards and regulations. 
 

2.2.  Long Range mode 

Switch  enables  operation  in  two  modes:  standard  and  extended  range.  When  the  Long  Range  switch  is  in 

STANDARD position (see Fig. 5), PoE ports operate at 100 Mb / s up to 100 meters. After switching to EXTEND position, 
range is increased to 250 meters and speed is reduced to 10 Mb / s. Additionally,  VLAN function, which isolates the PoE 
ports between each other (communication takes place between the UpLink ports and individual PoE), is activated. In both 
modes, the UpLink port speed is 100 Mb / s. 

Note:

 Changing the modes requires a power restart! 

 

2.3. Installation procedure 

 

 

Before installation, cut off the voltage in the 230 V power-supply circuit. 

To switch power off, use an external switch, in which the distance between the contacts of all 

poles in the disconnection state is not less than 3mm. 

 

 

 
1. Mount the PSU in a selected location and connect the wires.  
2. Connect the power cables (230 V) to L-N clips of the PSU.  
 

 

 

The shock protection circuit shall be performed with a particular care, i.e. the yellow and 

green wire coat of the power cable shall stick to one side of the terminal - 

marked with ‘

    

 

symbol on the PSU enclosure. Operation of the PSU without the properly made and fully 

operational shock protection circuit is UNACCEPTABLE! It can cause a device failure or 

an electric shock. 

 
3. Connect the ground wire to the terminal marked with the  symbol (power supply module connector). Connect the 

ground wire to the clip marked by the earth symbol 

. Use a three-core cable (with a yellow and green 

 protection 

wire) to make the connection. Lead the cables to the appropriate clips through the insulating bushing of the connection 
board.  
 
4. Connect the battery (mind the colours):   

          - battery output (+V): BAT+ cable / red, 
          - battery output (0V): BAT 

– cable / GND / black. 

 
 
 
5. Connect the power (230 V).  
6. Connect the camera cables to the RJ45 connectors (PoE connectors) and connect the recorder to the network (the   
UP LINK connector). 
7. Connect the power supply of the DVR (by default, the device is equipped with a cable terminated with the DC 2.1 / 5.5 
plug).  
8. Check the optical indication of the switch operation. 
9. After installing and checking proper working, the enclosure can be closed.  
 
 
 
 
 
 
 
 
 
 
 
 

Summary of Contents for S64-CRB

Page 1: ...date two 17 Ah 12 V batteries and offers the possibility of recorder installation The enclosure construction is compliant with the requirements of the General Data Protection Regulation GDPR the possi...

Page 2: ...ectricity consumption for own needs and the energy efficiency of the power intake track were taken into account The exact description of how to perform the calculations can be found at Approximate bac...

Page 3: ...C DC52115 converter 4 DC DC50SD converter 5 Output filter 6 Tamper micro switch terminals of tamper protection NC 7 Space for batteries 2 x 17 Ah 12 V connect the batteries in series 8 Recorder space...

Page 4: ...2 3x CSMA CD TCP IP Bandwidth 1 6 Gbps Transmission method Store and Forward Optical indication of operation Switch power supply Link Act PoE Status The given value of 30 W per port is the maximum val...

Page 5: ...PSU between input circuit and protection circuit between output circuit and protection circuit 3000 V AC min 1500 V AC min 500 V AC min Insulation resistance between input circuit and output or prote...

Page 6: ...tart 2 3 Installation procedure Before installation cut off the voltage in the 230 V power supply circuit To switch power off use an external switch in which the distance between the contacts of all p...

Page 7: ...3 1 LED indication of operating status The PSU is equipped with two diodes on the front panel RED LED on the PSU is supplied with 230 V off no 230 V supply GREEN LED on DC voltage in the AUX output o...

Page 8: ...g short circuit or output overload YELLOW LED LIGHT LINK The connection status of LAN devices 10 Mb s or 100 Mb s and data transmission OFF no connection ON the device is connected 10 Mb s or 100 Mb s...

Page 9: ...rk The PSU does not require performing any specific maintenance measures however in case of significant dust rate its interior is recommended to be cleaned with compressed air In case of fuse replacem...

Reviews: