8. Check the output voltage (the PSU voltage without load and without a battery should amount to 27,5 V ÷ 27,7V, 
with a battery or during battery charging process: 22,0 V÷27,6 V). If the value of the voltage requires adjustment, it 
should be set by the V

ADJ

 potentiometer, monitoring the voltage at the AUX output of the PSU. 

9. Connect the batteries in accordance with the markings: +BAT red to 'plus', -BAT  black to 'minus’. The LB diode 
should be on during battery charging process. 
10. With the STOP button, activate or deactivate a dynamic battery test. Deactivating the test turns out the PSU 
failure indication at the APS FLT output, but it does not affect the protection system against complete battery 
discharge. 
11. Check the current consumption of the receivers allowing of the battery charging current no to exceed the total 
current efficiency of the PSU. 
12. Once the tests and operation control have been completed, the enclosure can be locked. 
 
 

8. Operation and use. 

8.1. Over voltage protection OVP at the PSU output. 
In  case  of  voltage  exceeding  31V±0.5V  at  the  regulator’s  output,  the  system  cuts  off  the  power  at  the 

outputs to protect the battery and the receivers from damage. The outputs will be battery-powered. The protection 
system is indicated by illuminating of the OVP red LED on the pcb board, PSU FLT output status change into Hi-Z 
(high impedance), by sound and appropriate message on the PSU front panel. 

 
8.2 Overload of the PSU. 
The  PSU  has  been  equipped  with  a  LED  OVL  (overload)  indicator  light  on  the  pcb.  It  informs  about  the 

output  overload  status.  If  the  nominal  current  of  the  PSU  is  exceeded,  the  indicator  light  will  be  lit  and  the 
microprocessor  will  proceed  to  a  specially  implemented  procedure.  If  the  overload  threatens  the  PSU’s  power 
grade, the control system will decide about a disconnection of the AUX output. Restart will occur after 1 minute.  

 
8.3 Short circuit at the PSU output. 

 

In the case of a short circuit at the AUX or BAT output (load 200% ÷ 250% of the PSU power) or a reverse 

polarity connection,  the  F

BAT

  fuse  in  the  battery circuit  becomes  permanently  damaged  and  the  restoration  of  the 

voltage at the BAT output requires replacement of the fuse. 
 

8.4. Maintenance. 
Any  and  all  maintenance  operations  may  be  performed  following  the  disconnection  of  the  PSU  from  the 

power  supply  network.  The  PSU      does  not  require  performing  any  specific  maintenance  measures.  However,  in 
the  case  of  significant  dust  level,  clean  its  interior  with  compressed  air.  In  the case of a  fuse  replacement,  use a 
replacement of the same parameters. 

 
 
 
 
 
 
 
 
 
 
 

 

 

 

 

 

 

 

 
 
 
 
 
 
 

Summary of Contents for PSBEN 3024C

Page 1: ...PSBEN 3024C v 1 0 PSBEN 27 6V 3A 2x17Ah EN Buffer switched mode power supply unit EN Edition 3 from 20 11 2012 Supersedes the 2 from 14 09 2012 edition...

Page 2: ...11 4 4 STANDBY TIME 11 4 5BATTERY CHARGING TIME 12 4 6 OPERATION WITHOUT A BATTERY 12 5 REMOTE MONITORING OPTION WI FI ETHERNET RS485 USB 13 5 1 COMMUNICATION IN WI FI WIRELESS NETWORK 13 5 2 COMMUNIC...

Page 3: ...d OVL acoustic indication of failure adjustable times indicating AC power failure technical inputs outputs with galvanic isolation collective failure input EXT IN EPS technical output indicating AC po...

Page 4: ...urce are reported to the Alarm Receiving Centre ARC in accordance with 9 2 PN EN 50131 1 Output voltage 0 28A 1 5A battery charge General use if the PSU is not mounted within an installation which is...

Page 5: ...ring battery assisted operation 5 pin activation of the acoustic indication indication on indication off Caption jumper on jumper off 6 VADJ potentiometer DC voltage adjustment 7 BUZER acoustic indica...

Page 6: ...ent no Description 1 Insolation transformer 2 PSU board tab 1 fig 2 3 TAMPER micro switch contacts of tamper resistance NC 4 FMAIN fuse in the supply circuit 230 V AC 5 L N 230V AC power connector PE...

Page 7: ...status indication 3 1 Control panel The PSU is equipped with a panel with buttons and an LED display which enables reading the basic parameters of the device The buttons are for selecting and approvin...

Page 8: ...ment A Uo AUX output voltage measurement V Resolution for voltage measurement amounts to 0 1V for current measurement 0 1A Displayed voltage and current rates are only approximate For higher accuracy...

Page 9: ...ith galvanic isolation which change state if any of the following event occur EPS FLT output indicating AC power loss The output indicates AC power loss Under normal status with the 230V AC supply the...

Page 10: ...IN technical input has been implemented with galvanic isolation between the PSU s systems and the devices attached Fig 7 Electrical diagram of the EXT IN input The electrical diagram below shows the w...

Page 11: ...attery test facility can be switched off Deactivating activating the test during mains powered PSU operation press the STOP button on the main board and hold it for 3 seconds The device will confirm t...

Page 12: ...A Configuration of IBAT jumper 10h12m 1 5 J1 J2 J3 15h18m 1 J1 J2 J3 25h30m 0 6 J1 J2 J3 0 2 J1 J2 J3 4 6 Operation without a battery In case of an expected PSU operation without an attached battery m...

Page 13: ...ge of wireless communication is lack of additional cords and fast development or modification of the network s structure Fig 10 WI FI communication with the use of the WI FI INTW interface 5 2 Communi...

Page 14: ...B TTL INTU needs to be used This interface allows direct connection between the computer and the PSU and it is recognisable by the operating system as a virtual COM port Fig 13 KUSB TTL communication...

Page 15: ...for general use Io 3A 0 2A battery charge Io 2 6A 0 6A battery charge Io 2 2A 1A battery charge Io 1 7A 1 5A battery charge Output voltage setting escalation and keeping time 8ms 35ms 25ms Output vol...

Page 16: ...can be led Convectional cooling Table 8 Operation safety Protection class PN EN 60950 1 2007 I first Protection grade PN EN 60529 2002 U IP20 Electrical strength of insulation between input network ci...

Page 17: ...s of detaching the device from the mounting surface Proper installation is one of the requirements of the PN EN 50131 6 standard Fig 15 Fixing a tamper grip 2 Connect the power cables 230Vac to L N te...

Page 18: ...ers from damage The outputs will be battery powered The protection system is indicated by illuminating of the OVP red LED on the pcb board PSU FLT output status change into Hi Z high impedance by soun...

Page 19: ...t voltage 29 4V F07 ON 2 flashes ON PSU FLT Too high battery voltage Battery voltage 28V F08 ON 3 flashes ON PSU FLT Battery charging circuit failure Too low output voltage of the PSU set 26V Fault in...

Page 20: ...ibilities to carry out the repairs or if the equipment has been conditionally accepted due to the breaking warranty terms by the claimant 7 All the services rendered by force of the warranty are carri...