INSTALLATION – GENERAL
(FIGS 3 & 5)

PIPE FITTINGS

All pipe fittings are made via 22mm compression

fittings directly to the unit. The fittings are threaded

3/4”BSP male parallel should threaded pipe connec-

tions be required.

COLD FEED

A 22mm cold water supply is recommended, how-

ever if a 15mm (1/2”) supply exists which provides

sufficient flow this may be used (although more flow

noise may be experienced).

A stopcock or servicing valve should be incorporated

into the cold water supply to enable the Pullin

Evolution Solar and its associated controls to be

isolated and serviced.

COLD WATER COMBINATION VALVE ASSEMBLY

(FIG 1)

The 2-piece cold water combination valve assembly

can be located anywhere on the cold water mains

supply prior to the expansion vessel (see Fig. 5) but

the two pieces do not have to be installed together.

The pressure reducing valve incorporates the

pressure reducer & strainer and the expansion valve

incorporates the expansion & check valves. Ensure

that the valves are installed in the correct order and

orientation. No other valves should be placed

between the expansion valve and the Pullin Evolution

Solar unit. A connection can be made between the

expansion and pressure reducing valves to provide a

balanced cold water connection. The expansion

valve connection must not be used for any other

purpose.

EXPANSION VESSEL

The expansion vessel accommodates expansion that

results from heating the water inside the unit. The

unit is pre-charged at 3.5 bar. The expansion vessel

must be connected  between the expansion valve

(see Fig. 1) and the Pullin Evolution Solar (see Fig.

5). The location of the expansion vessel should allow

access to recharge the pressure as and when

necessary, this can be done using a normal car foot

pump. It is recommended that the expansion vessel

is adequately supported. An expansion vessel wall

mounting bracket is supplied for this purpose.

NOTE: DO NOT USE THE POTABLE WATER EXPAN-

SION VESSEL SUPPLIED WITH THE PULLIN

EVOLUTION SOLAR FOR ANY OTHER PURPOSE. IT

IS NOT SUITABLE FOR USE ON A SOLAR

PRIMARY CIRCUIT.

SECONDARY CIRCULATION

If secondary circulation is required it is recommended

that it be connected to the Pullin Evolution Solar as

shown in Fig. 2. The secondary return pipe should be

in 15mm pipe and incorporate a check valve to pre-

vent backflow. A suitable WRAS approved bronze cir-

culation pump will be required. On large systems, due

to the increase in system water content, it may be

necessary to fit an additional expansion vessel to the

secondary circuit. This should be done if the capacity

of the secondary circuit exceeds 10 litres.

Pipe capacity (copper)

15mm o/d = 0.13 l/m (10 litres = 77m)

22mm o/d = 0.38 l/m (10 litres = 26m)

28mm o/d = 0.55 l/m (10 litres = 18m)

Secondary circulation is NOT recommended for direct

electric units being used on Off Peak electricity tariffs.

OUTLET

The hot water outlet is a 22mm compression fitting

located at the top of the cylinder. Hot water distribu-

tion pipework should be 22mm pipe with short runs

of 15mm pipe to terminal fittings such as sinks and

basins. Pipe sizes may vary due to system design.

DRAIN TAP

A suitable draining tap should be installed in the cold

water supply to the Pullin Evolution Solar unit

between the expansion valve (see Fig. 1) and the

heater at as low a level as possible. It is recom-

mended that the outlet point of the drain pipework

be at least 1 metre below the level of the heater

(this can be achieved by attaching a hose to the

drain tap outlet spigot).

Fig. 1: Cold water combination valve assembly

Fig. 2: Secondary circulation connection

SECONDARY

CIRCULATION

PUMP

SECONDARY

RETURN

CHECK

VALVE

OUTLET T&P RELIEF

VALVE

SECONDARY

RETURN

CONNECTION

INLET

OUTLET

EXPANSION

VALVE

OUTLET

PRESSURE

REDUCING

VALVE

CARTRIDGE

& STRAINER

DIRECTION OF FLOW

BALANCED COLD

WATER CONNECTION

(NOT SUPPLIED)

EXPANSION VALVE

PRESSURE REDUCING VALVE

CHECK

VALVE

Summary of Contents for PES190

Page 1: ...ion Solar is a purpose designed unvented solar water heater The unit has a stainless steel inner vessel which ensures an excellent standard of corrosion resistance The outer casing is a combination of...

Page 2: ...ion should be placed between the 2 pieces of the cold water combination valve assem bly see Fig 1 Outlets situated higher than the Pullin Evolution Solar will give outlet pressures lower than that at...

Page 3: ...sion vessel wall mounting bracket is supplied for this purpose NOTE DONOTUSETHEPOTABLEWATEREXPAN SIONVESSELSUPPLIEDWITHTHEPULLIN EVOLUTIONSOLARFORANYOTHERPURPOSE IT ISNOTSUITABLEFORUSEONASOLAR PRIMARY...

Page 4: ...F E NOMINAL CAPACITY litres TYPE DIMENSIONS mm A B C D 2 Direct heating times assume use of lower element only and auxillary cylinder volume being heated SURFACE AREA m RATING kW RECOVERY mins 1 Recov...

Page 5: ...utlet size of the safety device between 18 and 27m at least 3 sizes larger and so on Bends must be taken into account in calculating the flow resistance Refer to Diagram 1 Table 1 and the worked examp...

Page 6: ...ny other purpose The tundish should not be located adjacent to any electrical components Valve outlet size Minimum size of discharge pipe D1 Minimum size of discharge pipe D2 from tundish Maximum resi...

Page 7: ...INDIRECT SYSTEM CONTROLS JUNCTION BOX GREEN YELLOW BROWN BLUE 3 DIRECT THERMOSTAT B A 1 1 2 2 3 INDIRECT THERMOSTAT INDIRECT THERMAL CUT OUT EXPANSION VESSEL COLD WATER COMBINATION VALVE 2 PIECE T P R...

Page 8: ...ls which must be installed as per the manufacturers instruc tions CONTROLOFSOLARPRIMARYCIRCUIT Temperature control of the Pullin Evolution Solar must be carried out using a suitable proprietory Solar...

Page 9: ...ry heating source boiler connections are made to the terminal block located under the terminal cover mounted on the side of the unit The supply cable s must be routed through the cable grip s in the t...

Page 10: ...SUPPLY ALL EARTH CONNECTIONS MUST BE CONNECTED BACK TO THE MAINS EARTH SUPPLY CONTROL CIRCUIT FOR AUXILLARY HEATING BOILER ONLY SEPARATE CONTROLS WILL BE REQUIRED FOR THE SOLAR PRIMARY CIRCUIT PROGRA...

Page 11: ...ing the lever on the motor housing to the FLUSHING ONLY setting When the circuit is full return the lever to the NORMAL USE position Switch on the boiler ensure the programmer is set to Domestic Hot W...

Page 12: ...stat and thermal cut out DIRECTMODELS Open the cover s to the immersion heater housing s and disconnect wiring from the thermostat mounted on top of the immersion heater s Remove the thermostat by car...

Page 13: ...FTHESAFETY VALVESFITTEDTOTHEPULLINEVOLUTION SOLARSYSTEM IFAFAULTISSUSPECTED CONTACTACOMPETENTINSTALLER TEMPERATURECONTROLS SOLAR Temperature control of the solar primary coil is by means of solar diff...

Page 14: ...6 Terminal cover 95 614 089 Indirect controls Indirect thermostat 95 612 697 Indirect Thermal cut out and Solar Cut out 95 612 698 Motorised valve 2 port 95 605 049 Terminal housing 95 614 090 4 Way t...

Page 15: ...required 1 DIRECT immersion heater not switched on 1 Check and switch on 2 DIRECT immersion heater thermal cut out has operated 2 Check Reset by pushing button 3 INDIRECT programmer set to Central Hea...

Page 16: ...register the product It has been installed in the United Kingdom The expansion vessel is guaranteed for a period of 2 years from the date of purchase The Pullin Evolution Solar s com ponents immersion...

Page 17: ...uture reference 2 This Log Book is to be completed in full by the competent person s who commissioned the equipment and then handed to the customer When this is done the Log Book is a commissioning ce...

Page 18: ...ER DATE REGISTEREDOPERATIVEIDCARDNO IFAPPLICABLE COMMISSIONING ENGINEER IF DIFFERENT COMPANYNAME ADDRESS ENGINEERNAME TELEPHONENUMBER DATE REGISTEREDOPERATIVEIDCARDNO IFAPPLICABLE APPLIANCE TIME CONTR...

Page 19: ...YES NO IS PRIMARY ENERGY SOURCE CUT OUT FITTED NORMALLY 2 PORT VALVE YES NO WHAT IS THE PRESSURE REDUCING VALVE SETTING IF FITTED BAR WHERE IS OPERATING PRESSURE REDUCING VALVE SITUATED HAS THE EXPAN...

Page 20: ...EL NO COMMENTS SIGNATURE SERVICE 2 DATE ENGINEER NAME COMPANY NAME TEL NO COMMENTS SIGNATURE SERVICE 3 DATE ENGINEER NAME COMPANY NAME TEL NO COMMENTS SIGNATURE SERVICE 5 DATE ENGINEER NAME COMPANY NA...

Reviews: