SIDE FOLD WALL MOUNT
18
Model 2500 Installation Checklist
Date: ________________
Unit Number
1
2
3
4
5
6
Building structure has been approved for unit loads.
__
__
__
__
__
__
Attachment anchor system has been approved for the
unit loads and installed per the structural engineer’s
specifications.
__
__
__
__
__
__
Washers have been installed under wood pad’s
carriage bolts.
__
__
__
__
__
__
Extension arms are level and square to the wall in
the play position.
__
__
__
__
__
__
Board and goal are level, plumb and set at appropriate
FOB (Face of Bank).
__
__
__
__
__
__
Goal height is correct.
__
__
__
__
__
__
Hardware is tight.
__
__
__
__
__
__
Quick links have been closed and tightened.
__
__
__
__
__
__
Unit folds and unfolds smoothly.
__
__
__
__
__
__
Height adjuster, if so equipped, is lubricated and
operates smoothly.
__
__
__
__
__
__
See height adjuster, board, and goal for additional installation instructions and checks.