PSS GARED 2500 Additional Installation, Operation And Maintenance Instructions Download Page 13

 

SIDE FOLD WALL MOUNT

   

 

 

12 

 

Check to make sure each side of the frame is still square to the wall.  Measure the distance from the 
wall to the face of the back board on each side.  Loosen the set screws in the outer tubes and slide the 
inner extension arm in or out until the face of bank (FOB) is reached.  Once both sides of the 
backboard are at the correct FOB and the frame is still square to the wall, tighten the set screws. Also 
tighten the eyebolt on the slide tube. 
 
Install the locking bolts on the extension 
arms the prevent movement of the arms. 
  
Drill a 7/16” hole 
through the inner 
extension tube using the 
hole in the outer tube as 
a guide. 
 
Install the 3/8” bolt 
(Item 28), locknut (Item 
30) and tighten securely. 
 
Repeat the process on all four extension 
tubes. 
 
Install the play position stop (muffler 
clamp) onto the inner slide tube.  
 
Adjust the position of 
the clamp to make sure 
the U-Bolt is under the 
indent of the spring arm 
on the locking clamp. 
Tighten the muffler 
clamp securely. 
 
The final step of the 
assembly is to level the frame extension 
arm by adjusting the chain tension with the turnbuckles.  It is important to not over adjust the chains 
as this causes undue stress on the chain anchor points.  Chain tension should be no more than enough 
to level the side frame tubes. 

 

 

 

Summary of Contents for GARED 2500

Page 1: ...OUNT Models 2500 Operation and Maintenance Instructions Please read all instructions before attempting operation of these units SAVE THESE INSTRUCTIONS FOR FUTURE USE PUBLICATION NO Issued 501756261 R...

Page 2: ...folding wall mount backstop No one under the age of 18 should operate the backstop unless properly supervised To prevent normal wear and tear from shortening the life of the backstop preventative mai...

Page 3: ...BRACKET 17 504155263 HINGE SIDEFOLD LONG 1 1 1 1 1 1 18 504151522 BRKT BOARD HINGE DIAGONAL 1 1 1 1 1 1 19 504152687 OUTER SLIDE TUBE A 46 1 504152689 OUTER SLIDE TUBE B 64 1 1 504152691 OUTER SLIDE T...

Page 4: ...backstop unit it is imperative the structural integrity of the wall has been evaluated and approved by an architect or structural engineer for the loads that will be imparted to the wall by the backs...

Page 5: ...SIDE FOLD WALL MOUNT 4 UNIT LOADING INFORMATION FOB FACE OF BANK BACKBOARD...

Page 6: ...ll Drill bits 7 16 9 16 5 8 Hammer Wrenches 1 2 9 16 11 16 and 3 4 Ratchet Wrenches with 1 2 9 16 11 16 and 3 4 sockets File 4 Level 25 Tape measure Duct Tape Block of wood for tapping Broom Shop Vac...

Page 7: ...2 Install the chain support brackets onto the top wood pad using the hardware shown in the above illustration Note the shorter chain support is installed on the end of the wood pad in the direction o...

Page 8: ...e as the frame pads DIM A DIM B DIM D DIM A DIM B DIM D LXP4200 9 9 1 8 2 97 m 36 0 91 m 63 1 60 m 1301B 10 1 5 8 3 09 m 20 0 51 m 35 0 89 m AFRG42 9 9 1 8 2 97 m 36 0 91 m 63 1 60 m 1342B 10 1 5 8 3...

Page 9: ...uce the strength of the wood Anchors should be diameter and the holes in the wood pads should be no larger than 9 16 in diameter The centerline of the holes should not be closer than 2 from the edge o...

Page 10: ...attachment is the same for all four pipes However the hinge brackets will be different from side to side and top to bottom Install the vertical brace tubes on each side of the unit Note the 7 16 carri...

Page 11: ...extension screw and lightly tighten the set screw Install the flange bushings on either side of the outer slide tube Insert the slide tube into the hinge bracket Install the x 3 1 2 bolt and add the n...

Page 12: ...the turnbuckle to the chain attach plate with a 5 16 quick link Attach the loose end of the chain to the turnbuckle using a quick link Tighten the turn buckle by hand putting only a light tension on t...

Page 13: ...he arms Drill a 7 16 hole through the inner extension tube using the hole in the outer tube as a guide Install the 3 8 bolt Item 28 locknut Item 30 and tighten securely Repeat the process on all four...

Page 14: ...ink Attach the loose end of the chain to the turnbuckle using a quick link Tighten the turn buckle by hand putting only a light tension on the chain DO NOT fully tighten at this time The turnbuckles w...

Page 15: ...e to the wall Measure the distance from the wall to the face of the back board on each side Loosen the set screws in the outer tubes and slide the inner extension arm in or out until the correct face...

Page 16: ...o level the frame extension arm by adjusting the chain tension with the turnbuckles It is important to not over adjust the chains as this causes undue stress on the chain anchor points Chain tension s...

Page 17: ...SIDE FOLD WALL MOUNT 16 Decal Locations...

Page 18: ...facility name and or the installation company below when you contact the factory and include it on any correspondence Please complete the checklist on the following page for each unit installed and in...

Page 19: ...age bolts __ __ __ __ __ __ Extension arms are level and square to the wall in the play position __ __ __ __ __ __ Board and goal are level plumb and set at appropriate FOB Face of Bank __ __ __ __ __...

Page 20: ...nit Next using the optional 9120 11 08 hand crank hook into the hole in the lower board hinge bracket and pull the unit to the stored position DO NOT pull into position using the eyebolt Once in the s...

Page 21: ...SIDE FOLD WALL MOUNT 20...

Page 22: ...hould only be tightened until the nut just engages the hinge bracket Do not overtighten the nut as this will cause binding and excessive wear on the bushings and the tubes TURNBUCKLES AND CHAINS Check...

Page 23: ...he facility name and or the installation company below when you contact the factory and include it on any correspondence I have received the maintenance and warranty information provided by your deale...

Page 24: ...ads splitting chipping etc OK Repair Replace Anchors Bolts OK Repair Replace Unit Supports Brackets Hinges Tubes dents stress spots etc OK Repair Replace Bolts loose deformed etc OK Repair Replace Bra...

Page 25: ...ed Holdings LLC Performance Sports Systems Gared Sports 9200 E 146th Street 9200 E 146th Street Noblesville IN 46060 Noblesville IN 46060 800 848 8034 800 325 2682 www perfsports com www garedsports c...

Reviews: