SIDE FOLD WALL MOUNT
12
Check to make sure each side of the frame is still square to the wall. Measure the distance from the
wall to the face of the back board on each side. Loosen the set screws in the outer tubes and slide the
inner extension arm in or out until the face of bank (FOB) is reached. Once both sides of the
backboard are at the correct FOB and the frame is still square to the wall, tighten the set screws. Also
tighten the eyebolt on the slide tube.
Install the locking bolts on the extension
arms the prevent movement of the arms.
Drill a 7/16” hole
through the inner
extension tube using the
hole in the outer tube as
a guide.
Install the 3/8” bolt
(Item 28), locknut (Item
30) and tighten securely.
Repeat the process on all four extension
tubes.
Install the play position stop (muffler
clamp) onto the inner slide tube.
Adjust the position of
the clamp to make sure
the U-Bolt is under the
indent of the spring arm
on the locking clamp.
Tighten the muffler
clamp securely.
The final step of the
assembly is to level the frame extension
arm by adjusting the chain tension with the turnbuckles. It is important to not over adjust the chains
as this causes undue stress on the chain anchor points. Chain tension should be no more than enough
to level the side frame tubes.