18
MGH Series - Manual
Rev030921
© 2021 PS Industries
®
Incorporated. All Rights Reserved.
Training and Operating Instructions
C. During Operation Checks:
1
Latching operates smoothly and disengages/engages.
TRUE
FALSE
2
Gate rolls smoothly with minimal effort and, no binding.
TRUE
FALSE
3
Gate is NOT impacted by the forklift, pallet jack, pallet, etc.
TRUE
FALSE
WARNING
If ANY Before Operation Checks are “FALSE” - DO NOT OPERATE!! Correct/Repair prior to operation.
D. After Operation Checks:
1
Any fault identified have been documented and reported to maintenance.
TRUE
FALSE
2
If faults were identified, gate has been TAGGED OUT OF SERVICE and opening
has been protected until maintenance has corrected the fault.
TRUE
FALSE
WARNING
DO NOT PROCEED TO THE LEADING EDGE OF THE GATE UNTIL GATE IS CLOSED AND LATCHED
STEP 5.
Pull on the Red Pull Handle to verify the gate is latched in the closed position.
STEP 6.
Visually verify that the gate is captured by the Stop Jamb.
STEP 7.
Verbally announce to all personnel in the area that the gate is now closed and latched.