Installation

Step 1

Illustration I

DETAIL M

4”

1

/

4

M

Face Mount Track

Existing 

Structure

20

GROUND VIEW

(Shown as Slide Direction: 

LEFT

)

View from 

Ground Level

N

Field 

Anchor

Face Mount Track

GROUND VIEW

(Shown as Slide Direction: 

LEFT

)

STEP 1. 

Installation of Face Mount Track.

a. Measure 4” beyond leading edge of opening and 1/4” below top of mezzanine deck (refer to Detail M for 

proper dimensions).

b. Field fasten Face Mount Track to your existing structure. (Fasteners supplied by the Installer.)

CRITICAL

 

Ensure mounting surface is capable of supporting all loading. Structural analysis of mounting surface 

is the responsibility of the Installer. Fasteners must be of sufficient size, grade, appropriate for anchoring 

material, etc. to accept the potential loading. Consult qualified Structural Engineer.

STEP 2. 

Installation of Track Assembly.

a. Place Gate Housing Track on top of the Face Mount Track and line it up with the provided holes.

b. Attach Gate Housing Track with

 5

/

16

” carriage bolts and nylock nuts.

c. Field fasten Gate Housing Track to your existing structure using factory located holes. (Fasteners 

supplied by the Installer.)

CRITICAL

 

Ensure mounting surface is capable of supporting all loading. Structural analysis of mounting surface 

is the responsibility of the Installer. Fasteners must be of sufficient size, grade, appropriate for anchoring 

material, etc. to accept the potential loading. Consult qualified Structural Engineer.

1.1

22

DETAIL N

4”

1

/

4

21

View from 

Ground Level

Step 2

Illustration I

Summary of Contents for Safemezz MGH Series

Page 1: ...e contents of this manual and the specifications of this product are subject to change without notice PS Safety AccessTM reserves the right to make changes without notice in the specifications and mat...

Page 2: ...s designed to meet 1 OSHA Railing Standard 1910 28 and OSHA 1910 29 B Operation in a manner other than intended could result in damage or less than acceptable performance at time of need for which the...

Page 3: ...e Mount Systems 1 Scaffolding or Personnel Lift B Tools 1 One 1 Drill for Anchoring 2 One 1 Phillips Screwdriver 3 One 1 Pliers 4 One 1 9 16 Wrench 5 One 1 1 2 Wrench 6 One 1 7 16 Wrench 7 One 1 Tape...

Page 4: ...irection a Look up at the mezzanine deck from the ground level to determine what slide direction will be needed 1 Slide Direction RIGHT install your gate assembly using the holes marked with green dec...

Page 5: ...dge of opening b Field fasten Track Assembly to your existing structure using factory located holes Fasteners supplied by the Installer CRITICAL Ensure mounting surface is capable of supporting all lo...

Page 6: ...tion Upper Hole Location Leading End Blue Decal Blue Decal STEP 4 Install Manual Latch Assemblies using supplied hardware from the Manual Latch Hardware Kit a Attach both Manual Latch Assemblies as sh...

Page 7: ...te Guide Block to top of Gate Assembly using 5 16 carriage bolts washers and nylock nuts a The notch located in Guide Block MUST be orientated towards existing structure refer to Detail F for correct...

Page 8: ...o the Gate with 5 16 carriage bolts washers and nylock nuts a Handle MUST be installed on the trailing end of the Gate Trailing End STEP 8 Install Shroud Assembly to top of Track Assembly as shown a A...

Page 9: ...to Track and Shroud Assemblies a Slide Gate to fully open position Gate inside Track and Shroud Assemblies Shroud Assembly Step 9 Illustration I Track Assembly Shroud Assembly I SIDE VIEW Step 9 Illus...

Page 10: ...ientation DECK VIEW Shown as Slide Direction LEFT STEP 11 Install Stop Jamb onto Existing Structure a Keep Gate Assembly in the fully open position Gate inside Track and Shroud Assemblies b Field fast...

Page 11: ...th Open and Closed Positions IX Installation of Optional Face Mount Track A Recommended Equipment Scaffolding or Personnel Lift B Once steps have been completed continue with Shroud Assembly Installat...

Page 12: ...responsibility of the Installer Fasteners must be of sufficient size grade appropriate for anchoring material etc to accept the potential loading Consult qualified Structural Engineer STEP 2 Installa...

Page 13: ...OTTER 1 8x 3 4 ZN 2 503403 14 MGH UHMW GATE GUIDE BLOCK 1 511500 15 BOLT CARRIAGE5 16 18X2 1 4 GR5 4 506502 16 MGH ROUND PULL HANDLE PCR 1 511496 17 MGH MANUAL LATCH ASSEMBLY LH 1 511517 18 MGH MANUAL...

Page 14: ...Parts Diagram XIII Replacement Parts Diagram A These Replacement Parts Diagrams for all SafeMezz Horizontal Gate Manual Models B The Replacement Parts List is located on Page 13 DETAIL Q 13 O P Q DETA...

Page 15: ...e shroud block Shroud Block fasteners Fasteners must be present and be snug tight connections pulled into firm contact by the bolt no gaps between material Tighten fasteners to snug tight Replace any...

Page 16: ...ns and configurations Gate is not rusting corroded Minor surface rust corrosion No scaling or pitting of material Clean and touch up minor surface rust If rust scale or pitting is present replace gate...

Page 17: ...maintenance or operation instructions to meet additional requirements XVI Operating Instructions CAUTION CAUTION For products that are approved for use as a means of fall protection the product only s...

Page 18: ...t Repair prior to operation D After Operation Checks 1 Any fault identified have been documented and reported to maintenance TRUE FALSE 2 If faults were identified gate has been TAGGED OUT OF SERVICE...

Page 19: ...iration of the above stated Limited Warranty period together with proof of purchase Contact PS Industries at the address shown below PS Industries Incorporated Toll Free 877 446 1519 Attention Warrant...

Page 20: ...877 446 1519 4psinfo psindustries com pssafetyaccess com 1150 South 48th Street Grand Forks ND 58201 Product Registration psindustries com contact register your product...

Reviews: