12
MGH Series - Manual
Rev030921
© 2021 PS Industries
®
Incorporated. All Rights Reserved.
Installation
Step 1
Illustration I
DETAIL M
4”
1
/
4
”
M
Face Mount Track
Existing
Structure
20
GROUND VIEW
(Shown as Slide Direction:
LEFT
)
View from
Ground Level
N
Field
Anchor
Face Mount Track
GROUND VIEW
(Shown as Slide Direction:
LEFT
)
STEP 1.
Installation of Face Mount Track.
a. Measure 4” beyond leading edge of opening and 1/4” below top of mezzanine deck (refer to Detail M for
proper dimensions).
b. Field fasten Face Mount Track to your existing structure. (Fasteners supplied by the Installer.)
CRITICAL
Ensure mounting surface is capable of supporting all loading. Structural analysis of mounting surface
is the responsibility of the Installer. Fasteners must be of sufficient size, grade, appropriate for anchoring
material, etc. to accept the potential loading. Consult qualified Structural Engineer.
STEP 2.
Installation of Track Assembly.
a. Place Gate Housing Track on top of the Face Mount Track and line it up with the provided holes.
b. Attach Gate Housing Track with
5
/
16
” carriage bolts and nylock nuts.
c. Field fasten Gate Housing Track to your existing structure using factory located holes. (Fasteners
supplied by the Installer.)
CRITICAL
Ensure mounting surface is capable of supporting all loading. Structural analysis of mounting surface
is the responsibility of the Installer. Fasteners must be of sufficient size, grade, appropriate for anchoring
material, etc. to accept the potential loading. Consult qualified Structural Engineer.
1.1
22
DETAIL N
4”
1
/
4
”
21
View from
Ground Level
Step 2
Illustration I