Fibre to SAS/SATA RAID Subsystem
User Manual
163
6.
Place the front panel in a safe place.
7.
If the right bottom board will be replaced, unlock and remove disk trays 1 to 21
and hung the trays in the slots. If the left bottom board will be replaced, unlock
and remove disk trays 22 to 42 and hung the trays in the slots.
Summary of Contents for EP-4423
Page 1: ...Fibre to SAS SATA RAID Subsystem User Manual Revision 1 0...
Page 67: ...Fibre to SAS SATA RAID Subsystem User Manual 67...
Page 68: ...Fibre to SAS SATA RAID Subsystem 68 User Manual...
Page 69: ...Fibre to SAS SATA RAID Subsystem User Manual 69...
Page 70: ...Fibre to SAS SATA RAID Subsystem 70 User Manual...
Page 71: ...Fibre to SAS SATA RAID Subsystem User Manual 71...