
Part 4: Installation and Start-up
Commissioning
55
Commissioning
Commissioning level
Enter all values one after the other
Ä
Open level,
Ç
adjust value,
Ä
save value and
activate next value
GERMAN Set
language
Minute
Set current time:
Hour
Set current time:
YEAR
Set current date
MONTH
Set current date
DAY
Set current date
HC FUNCTION
D
1 00, 01, 03, 05 (see page 38)
HC FUNCTION
D
2 00 - 04 (see pg. 38)
CAP/MODULE
00 – 1000 KW (see pg. 32)
BUS ID I
(see pg. 56)
Enter number for heating circuit
"1": 00-15 => Standard 01
BUS ID
2
(see pg. 56)
Enter number for heating circuit
"2": 00-15 => Standard 02
5K SENSOR
(code number)
00 = 5KOhm NTC sensor
01 = 1kOhm PTC sensor
Commissioning procedure
1. Please read this guide carefully before commissioning
2. Fit controller, make electrical connections and switch
on heat generator and supply voltage
3. Wait until standard display appears on controller
4. Open hinged operating cover
When the hinged operating flap is opened for the first time
after switching on, the "INSTALLATION" is shown on the
display.
5.
Ä
Start INSTALLATION
6.
Ç
Set value
7.
Ä
Save value and next value
8. Close hinged operating flap (end of INSTALLATION)
9. Move program switch to required operating mode, e.g.
automatic 1 (see page 6)
Bus ID (heating circuit number):
The heating circuits are sequentially numbered starting
with "01". Heat circuit numbers must not be assigned
twice. Please only use "00" for replacement controllers
(see page 56).