PROSEP FILTER SYSTEMS RO-pro-325 Operation & Installation Instruction Manual Download Page 7

RO-

pro

 

Reverse Osmosis System   

 

 

                  Manual

FILTER MAINTENANCE AND CHANGE INSTRUCTIONS:

This recommendation is intended for maximum efficiency of RO water production by your system.

1,

 

Filter Maintenance

a, 

It is OK to put pre & post filters of the shelf for several years.

b, 

Keep the sealed, non-opened filter in an air tight container to prevent it from absorbing contaminants

 

from the air.

2, 

Membrane Maintenance

a, 

The dry packed membrane usually has a two-year shelf life. To prolong the shelf life, we recommend

 

you keep the non-opened  dry membrane in the refrigerator.

b, 

Once used, we recommend you run the RO system every day, at least 10-15 minutes (about 1 gallon or 4

 

litres drinking water.) This helps to maintain the membrane performance.

c, 

If the RO system is not used for a few weeks, drain the storage tank. To bring the unit into service fill the

 

tank and drain it twice, to allow to refill.  

Your RO system will then be ready to reuse.

3, 

Filter & Membrane Change Procedures:

a, 

Shut off the water supply.

b, 

Turn off the tank ball valve by turning the handle through 90 degrees.

c, 

Open the tap fully for continuous flow.

d, 

Slide the housing wrench in (bowl spanner) over the filter bowl. Use one hand to hold the system and

 

the other hand to turn the wrench clockwise to separate the head from the bolw.

NOTE: 

 IF  IT  IS  TOO  TIGHT  TO  OPEN  THE  HOUSING  YOU  MAY  TRY  TO  UNPLUG  THE  FITTING 

BETWEEN  THE  RED  TUBING  AND  THE  SYSTEMS  IN  ORDER  TO  REDUCE  THE  AIR  AND  WATER 
PRESSURE INSIDE THE HOUSING.

e, 

After opening the housing, remove the used filter and put the new filter into the housing. The

 Carbon

 

Prefilter

 can be installed either way up.  The

 blue GAC post filter

 must be installed the correct  way  up

 

with the white tapered cap to the top. Make sure the O-ring is in place and smear a little petroleum jelly

  

on the O-ring. Replace the filter bowl and tighten bu turning the bowl anti-clockwise.

f, 

Repeat previous step for all other filter changes. (See separate instructions for membrane change below.)

g, 

Turn on the water supply and make sure there are no leaks.

h, 

Let the water drip from the tap for about 10 minutes. If the water flow is less than 1 cup (8 oz or 240 ml)

 

per minute, it may be a signal to change the membrane.

i, 

Membrane Change Procedure:

 

Shut off water supply.

 

Unscrew the cap of the membrane housing.

 

Slide out the used membrane and discard. (You may need thin nosed pliers to grip the membrane spigot.)

 

Insert the new membrane with the 2 O-rings into housing first with the black brine seal at the open end

 

of the membrane housing.  

 

Be sure it is fully seated into bottom end.

 

Screw cap back on to the membrane housing, make sure O-ring is still in place.

 

Turn on water supply & check for leaks.

 

It may take 10-20 minutes for new membrane to run to normal flow. 

Carry out system start up procedure.

Summary of Contents for RO-pro-325

Page 1: ...N INSTRUCTIONS PROSEP FILTER SYSTEMS LTD UNIT G19 RIVER BANK WAY LOWFIELDS BUSINESS PARK ELLAND WEST YORKSHIRE HX5 9DN Tel 01422 377367 Fax 01422 377369 Email domestic prosep co uk Web www prosep co u...

Page 2: ...er System from PROSEP Filter Systems Ltd With proper care your water filtration system will produce high quality drinking water for many years Read carefully and follow the instructions in this manual...

Page 3: ...ical for effective reduction of total dissolved solids System Tested and Certified by NSF International against ANSI NSF Standard 58 for the reduction of Barium Cadmium Copper Cyst Hexavalent Chromium...

Page 4: ...Stage Granular Activated Carbon Post Filter Cartridge Auto shut off valve Operating Pressure 40 120 PSI Operating Temperature 40 110 deg F Recovery Rate 20 25 Product Code Description Service Life PRO...

Page 5: ...you are uncertain run the hot tap for a minute and feel the pipes under the sink to distinguish the cold pipe Do not fit the valve on a bend a join or where there is solder on the copper pipe Attach t...

Page 6: ...ould take 2 3 hours to complete After the second tank is filled you may enjoy the pure water Check for leaks daily for the first week and periodically thereafter You may notice that the water may be m...

Page 7: ...NOTE IF IT IS TOO TIGHT TO OPEN THE HOUSING YOU MAY TRY TO UNPLUG THE FITTING BETWEEN THE RED TUBING AND THE SYSTEMS IN ORDER TO REDUCE THE AIR AND WATER PRESSURE INSIDE THE HOUSING e After opening t...

Page 8: ...ow Normally it takes 2 3 hours to fill the tank Low water pressure and or temperature can reduce production rate Add pressure to storage tank The pressure should be 8 10psi when the tank is empty Slow...

Reviews: