PROSEP FILTER SYSTEMS RO-pro-325 Operation & Installation Instruction Manual Download Page 3

RO-

pro

 

Reverse Osmosis System   

 

 

                  Manual

CHECK LIST:

1) 

TGI Reverse Osmosis System.

2) 

Water Storage tank, (2.8 gallon @ 40psi).

3) 

Four coloured tubing (black, blue, red, yellow) 1/4” OD (some supplied 3/8” OD), 4’ each colour.

4) 

Installation kit: tank ball valve, drain saddle tap valve, feed water valve, tap assembly.

5) 

Manual.

This Reverse Osmosis system contains a replaceable treatment component critical for effective reduction of total 
dissolved solids. 

System Tested and Certified by NSF International against ANSI/NSF Standard 58 for the reduction of Barium, 
Cadmium, Copper, Cyst, Hexavalent Chromium, Lead, Radium 226/228, Selenium, TDS, Trivalent Chromium.

RECOMMENDED TOOLS LIST

 

 

Variable speed drill

 

 

1/8” and 1/4” drill bits

 

 

7/16” drill bit 1/2” and 9/16 open-end wrenches (or adjustable)

 

 

Phillips screwdriver

 

 

Utility knife

 

 

Teflon Tape

PRE  PLUMBED  REVERSE 

OSMOSIS SYSTEM

SADDLE  TAPPING  VALVE 

WITH TUBE ATTACHED

WATER  STORAGE  TANK  AND 

BALL VALVE

TAP  AND 

CONNECTOR

WASTE PIPE 

CONNECTOR

Summary of Contents for RO-pro-325

Page 1: ...N INSTRUCTIONS PROSEP FILTER SYSTEMS LTD UNIT G19 RIVER BANK WAY LOWFIELDS BUSINESS PARK ELLAND WEST YORKSHIRE HX5 9DN Tel 01422 377367 Fax 01422 377369 Email domestic prosep co uk Web www prosep co u...

Page 2: ...er System from PROSEP Filter Systems Ltd With proper care your water filtration system will produce high quality drinking water for many years Read carefully and follow the instructions in this manual...

Page 3: ...ical for effective reduction of total dissolved solids System Tested and Certified by NSF International against ANSI NSF Standard 58 for the reduction of Barium Cadmium Copper Cyst Hexavalent Chromium...

Page 4: ...Stage Granular Activated Carbon Post Filter Cartridge Auto shut off valve Operating Pressure 40 120 PSI Operating Temperature 40 110 deg F Recovery Rate 20 25 Product Code Description Service Life PRO...

Page 5: ...you are uncertain run the hot tap for a minute and feel the pipes under the sink to distinguish the cold pipe Do not fit the valve on a bend a join or where there is solder on the copper pipe Attach t...

Page 6: ...ould take 2 3 hours to complete After the second tank is filled you may enjoy the pure water Check for leaks daily for the first week and periodically thereafter You may notice that the water may be m...

Page 7: ...NOTE IF IT IS TOO TIGHT TO OPEN THE HOUSING YOU MAY TRY TO UNPLUG THE FITTING BETWEEN THE RED TUBING AND THE SYSTEMS IN ORDER TO REDUCE THE AIR AND WATER PRESSURE INSIDE THE HOUSING e After opening t...

Page 8: ...ow Normally it takes 2 3 hours to fill the tank Low water pressure and or temperature can reduce production rate Add pressure to storage tank The pressure should be 8 10psi when the tank is empty Slow...

Reviews: