
5.28
•
After achieving required tightness, tighten counter nut (4).
FIGURE 5.13
I STAGE OF FRONT CHAIN GEARING
(1) chain, (2) tensioner toothed cog, (3) tensioner bolt, (4) counter nut, (5) tightening nut
Check drive chain tightness of the I stage of transmission gear:
•
every 10 hours of work - before greasing chain.
5.2.17 OPERATION NO. 17 – INSPECTION OF TIGHTNESS OF FRONT CHAIN
TRANSMISSION (II STAGE)
Summary of Contents for T740
Page 4: ......
Page 38: ...2 18 ...
Page 68: ...3 30 FIGURE 3 22 Lighting panel Description of markings on table 3 5 ...
Page 70: ...3 32 ...
Page 108: ...5 20 FIGURE 5 6 TRAILER GREASING POINTS CHASSIS ...
Page 109: ...5 21 FIGURE 5 7 TRAILER GREASING POINTS VERTICAL CONVEYOR ...
Page 111: ...5 23 FIGURE 5 10 TRAILER GREASING POINTS FRONT CHAIN GEARING ...
Page 135: ...NOTES ...
Page 136: ... ...