4.
To break out the holes, puncture the slit in the middle of the holes
using a medium-sized screwdriver (tip width 3.5 - 4 mm) and lever
the material out - see figure.
P_PMA_BEZ_0082_SW
Fig. 14
5.
Smooth the edges.
6.
Screw in the appropriate threaded cable glands (
, 2)
using suitable lock nuts (1) and tighten firmly.
7.
Insert multiple seal inserts (3) in the threaded cable glands
according to the cable diameter being used.
8.
Feed cables into the threaded cable glands. Where there are mul‐
tiple sealing inserts (see Fig. 15), observe the permitted cable
cross-section, see "Table Clamping Range" in the "Wiring diagrams"
chapter.
9.
Further steps are contained in .
Thereafter please continue with the following steps:
10.
Tighten the union nuts (see , item 4) of the threaded cable glands
so that they are leak-tight.
Installation
29