Pr
o
Minent
®
Page 41
3.3
Placing Out of Operation and Frost-Proof Storage
If the chlorine dioxide system is to be made winter-safe, it will be necessary to completely
discharge the reactor and drain off the bypass line. After flushing with water, the system can be
drained off at the underside of the reactor by opening the pressure retention valve on the reactor
output/bypass and by removing the inlet valves.
• Switch on the extraction system by pressing the “Extraction” push-button before dismantling
the reactor inlet valves.
4
Replacing acid and chlorite component tanks
• shut system down by pressing “STOP” button
• place component tanks under the system (view from front: acid on left, chlorite on right, water
supply tank in the middle)
• immerse intake lances into corresponding tank, leaving foot valve suspended just above
bottom of tank
• replace cover and screw tightly
• start up system again
Shutting down chlorine dioxide system / Replacing acid and chlorite component tanks
Summary of Contents for Bello Zon CDKa 10000
Page 57: ...ProMinent Page 57...