48
7
1
5
2
9
10
51
APPLY LOCTITE
®
242
TO THREADS
TORQUE: 75 ± 7 IN-LBS
6
3
TORQUE:
100 ± 10 IN-LBS
TORQUE:
75 ± 7 IN-LBS
SHOWN IN "R" POSITION
6
15
8
Figure K.
14.
Referring to figure K, install the motor (item 6) onto the burner
head flange and secure with four M6 screws (item 10). Ensure to
apply Loctite
®
242 (item 51) to the screw threads prior to
installation.
NOTE:
Motor (item 6) must be re-installed according
to its original position (see orientation marks item figure K inset).
15.
Install the PCM (item 9), then reconnect the motor (item 6), fuel
solenoid (item 7) and ignition module (item 8) to their respective
terminals.
NOTE:
Ensure the PCM is reinstalled in its original
orientation.
Copy Part# 206000, Rev. E
Page 7 of 9
Date: 05/2017
© 2010 Marine Canada Acquisition Inc. DBA SEASTAR SOLUTIONS 3831 No. 6 Road, Richmond, B.C. Canada V6V 1P6
Tel: 604.270.6899
Web: www.proheat.com
INSTALLATION INSTRUCTIONS