7.
Remove the motor (item 6) by removing the four M6 screws (item 10).
Note initial orientation of motor for reassembly (refer to figure A inset).
8.
Remove and discard the Motor Gear (item 11) by removing the
retaining ring (item 4).
Ensure Motor Shaft and retaining ring
groove are thoroughly cleaned and free from all green Loctite
®
adhesive before reassembly.
9.
Turn the Burner head over as shown in figure B. Remove the
ignition electrode (item 28) then the flame shield (item 29).
10.
Remove the valve cover (item 18) by removing the four M5 screws
(item 16) and lock washers (item 17).
11.
Remove and discard the two O-rings (item 19 & 20) and cylinder
head assembly (item 21).
12.
Remove the #8 screw (item 22) from the connecting rod assembly
(item 23), then remove the intake disk (item 24), diaphragm (item
25) and compression disk (item 26).
13.
Remove and discard the two O-rings (item 27) from the burner head
flange (item 15).
28
29
31
18
19
21
22
27
12
14
4
13
33
26
15
25
23
32
24
20
30
17
16
17
Figure B.
Heat may be required. Use a heat gun
directed at the screw head (item 32) to
loosen the Loctite
®
bond.
NOTICE
32
Area must be free from any combustible
fuels when using a heat gun.
WARNING
Copy Part# 206000, Rev. E
Page 2 of 9
Date: 05/2017
© 2010 Marine Canada Acquisition Inc. DBA SEASTAR SOLUTIONS 3831 No. 6 Road, Richmond, B.C. Canada V6V 1P6
Tel: 604.270.6899
Web: www.proheat.com
INSTALLATION INSTRUCTIONS