7
5. CONNECTION SCHEME OF MISCELLANEOUS OPTIONS
♦
Delay option in the pump input.
Option of 2 irrigation sector with delay in the input pump.
Page 1: ...f a programmable clock which can be built into the unit b By signals from external elements level sensors another programmer etc c Manually MANUAL START button The activation time of the starter motor...
Page 2: ...the unit will automatically activate the stop relay also keeping the SENSOR BREAKDOWN indicator lit although the breakdown disappears This will only go out on restarting engine again However if the b...
Page 3: ...NG BOX Metal with lock 25x25x8 3 INSTALLATION 3 1 WALL MOUNTING 4 pieces for wall mounting are supplied with the unit which are mounted from the outside and without need to open the unit in the holes...
Page 4: ...r with a similar wire There are engines which need to work with double injection by way of a small electro magnet which will be connected in parallel with the starter The stop outlet terminal 3 can ac...
Page 5: ...positive to the pole of the winding 3 7 OPTION WITH PREHEATING The units delivered with this option incorporate another button on the frontpiece where the timing in seconds of the preheating to be car...
Page 6: ...ted and the WORKING LED does not light up CAUSES Mistaken polarity in the supply The oil pressure gauge is not connected to terminal 5 The oil pressure gauge is defective or does not indicate mass wit...
Page 7: ...7 5 CONNECTION SCHEME OF MISCELLANEOUS OPTIONS Delay option in the pump input Option of 2 irrigation sector with delay in the input pump...
Page 8: ...8 Option of irrigation plus fertiliser with delay in the input pump...