23
1-
DESCRIPTION
–OPERATIONS
The
PROFROID
GQ
condensing
unit
is
made
up
primarily
of:
-
1
or
2
COPELAND
hermetic
scroll
compressor
ZB
or
ZF
(standard
or
digital
following
models),
-
1
air-cooled
condenser
with
2
helicoid
fans
(T1
to
T4)
or
2
fans
with
EC
motors
(T5),
-
1
liquid
receiver,
1
safety
valve
following
volume,
1
filter
drier,
1
sight
glass,
1
muffler
on
discharge
line,
-
1
electrical
cabinet,
1
main
switch,
-
safety
:
1
high
and
1
low
pressure
switches
per
compressor
-
control
:
suction
side
:1
low
pressure
switch
per
compressor
or
specific
controller
(models
with
digital
compressor)
-
discharge
side
:
1
electronic
fan
speed
controller
(HP
control).
Unit
power
supply
:
400V
±10%
/
3
+
N
/
50Hz
(Neutral
EN
as
standard
+
neutral
+
Earth
The
set-up
is
mounted
on
a
galvanised
folded,
sheet
steel
frame,
with
white
painted
sheet
metal
side
panels.
The
unit
is
specially
designed
to
reduce
noise
and
vibration.
The
unit
can
be
provided
with
remote
electronic
controller
PROCOLD
(optional).
The
QUIETOR
range
is
divided
in
two
parts
:
Medium
temperature
:
-20°C
->
+5°C
Low
temperature
:
-40°C
->
-20°C
HFC
fluids
:
R404A/R507A/R134A/R407F/R407A/R407C/R422A/R417A/R448A/R449A.
Options
:
Room
control
by
remote
electronic
controller.
Special
coating
in
corrosive
atmosphere
(by
Blygold
protection).
Waterproof
remote
control
box
(on-off
switch,
light,
5
m
of
cable).
Oil
separator
Oil
se
oil
receiver
4liters
for
TWIN
models
only.
Desuperheater
Manometers
Electronic
controller
for
LP
and
HP
Floating
HP
(to
be
combine
with
option
electronic
controller).
SCROLL DIGITAL VERSION
This
device
is
able
to
modulate
capacity
between
10
and
100%
(by
separating
the
scroll
set
axially
over
a
short
period
of
time
Capacity
is
controlled
by
specific
controller
function
of
suction
pressure
EC2-552
(find
attached
notice)
or
XC
645
(option
electronic
controller)
This
technology
is
interesting
for
multiple
evaporators’
installations
and
for
applications
requiring
precise
temperature
control.
2-
INSTALLATION
HANDLING
Units
size
1
&
2:
Unit
must
be
handle
by
elevator
Units
size
3,
4
and
5:
Units
have
4
attachment
lugs
for
handling
(situated
on
4
frame
angles).
During
handling
of
condensing
units
with
a
crane,
lifting
hooks
will
be
fix
to
the
4
attachments
lugs.
SPECIFIC
INSTALLATION
RECOMMENDATIONS
The
unit
must
be
put
and
fixed
to
a
ground
plan
supporting
the
weight
of
the
unit
(4
points
of
fixation
are
foreseen).
Any
other
mounting
will
have
to
be
the
object
of
a
study
of
structure
adapted
to
the
frame
of
the
unit.
Summary of Contents for QUIETOR GQH-GQL
Page 51: ...48 e ct d ROl...