5.5
HEAT EXCHANGERS WITH HERESITE® COATING
Turn off the entire unit, and secure the unit against unintentional power-on.
Comply with the site's specific safety instructions.
For maintenance on heat exchangers coated with HERESITE® treatment, please refer to SAKAPHEN® INSTRUCTION TECHNIQUE
INS/TEC/18 procedure attached below.
It is an obligation to respect the spraying instructions as well as the distance and water pressure indicated in chapter 5.2 LOW PRESSURE
CLEANING – SLIGHTKY SOILED COILS (3 bars maximum @ 400mm minimum).