Measuring Process

© 2001 PROCEQ SA

5.2.2

Clear Memory

Objects cannot be deleted individually.

You can only delete the entire memory 
contents. This action cannot be undone after it
has been confirmed.

5.2.3

Display Memory

The measurement series number, the impact direction of
the concrete test hammer and the measured rebound
values R after deletion of the outliers, as well as the 
average of the rebound values 

or of the compressive

strength of the concrete are displayed.

5.2.4

Output on the Printer

For data transmission, use the printer cable 
Art. No. 330 00 460. Printing can be performed on all
commercially available printers with a serial port. The 
following printing options are available:
- Printer is connected to the display unit during measu-

rement (online):
After completion of a measurement series (the prese-
lected no. of test impacts has been performed), the
data are sent to the printer. Transmission is also pos-
sible at any time by pressing the PRINT key.

- Printing via memory:

In the sub-menu ”Display memory” the desired measu-
rement series can be selected with the 

keys.

Printing is performed by pressing the PRINT key.

Fig. 5.6

Example of a print protocol

Bedienungsanleitung DIGI-SCHMIDT 2000.qxd  12.12.2002  16:24  Seite E12

Summary of Contents for DIGI-SCHMIDT 2000 LD

Page 1: ...nungsanleitung Operating Instructions Mode d emploi Betonpr fhammer DIGI SCHMIDT 2000 Concrete Test Hammer Modell ND LD Scl rom tre b ton Bedienungsanleitung DIGI SCHMIDT 2000 qxd 12 12 2002 16 23 Sei...

Page 2: ...tions 7 Display Range 9 Limit Values 9 Language 9 Date Time 9 Data Output 9 5 Measuring Process 10 Measuring Procedure 10 Data Output 11 6 Maintenance and Care 13 Cleaning After Use 13 Performance Che...

Page 3: ...are due to one or more of the follo wing causes Failure to use the concrete test hammer in accordance with its designated use Incorrect performance check operation and mainte nance of the concrete te...

Page 4: ...rules of behavior are disregarded Warning This note warns you about the risk of material damage financial loss and legal penalties e g loss of warranty rights liability cases etc This denotes importan...

Page 5: ...strength of the concrete fck There is a specific relationship between the rebound value R and the hardness and strength of the concrete The following factors must be taken into account when ascertaini...

Page 6: ...Test o k Remaining battery life Then the measuring display of the previously measured object appears see Fig 3 1 but without values If no display appears replace the batteries Fig 3 1 Measuring displ...

Page 7: ...is calculated from the number of test impacts n entered or after a measurement series has been completed by pressing the END key Where possible enter at least n 10 or n 12 see under Mx example on page...

Page 8: ...of the PROCEQ Standard curves refer to Derivation of the PROCEQ Standard Conversion Curves page 19 Select conversion curve A in line no 7 for concrete with an age of 7 days fck7 or the conversion cur...

Page 9: ...reduction factor is set automatically 4 5 3 Eliminate Outliers The following 4 functions can be selected 0 M1 M3 and Mx Using function 0 individual values can be deleted manually Using the functions M...

Page 10: ...s on the display serve to aid fast recogni tion of deviations from the measured values The range within which the rebound values R are to lie can be selected see Fig 3 1 Measuring display page 5 The s...

Page 11: ...cular to the test sur face before you trigger the impact Each test surface should be tested with at least 10 impacts The individual impact points must be spaced at least 20 mm apart Fig 5 3 Performing...

Page 12: ...t a hard surface at moderate speed When the impact is triggered press push button 6 Impact plunger 1 is locked in a retrac ted position and the impact spring is under no load Fig 5 4 Locking the impac...

Page 13: ...smission use the printer cable Art No 330 00 460 Printing can be performed on all commercially available printers with a serial port The following printing options are available Printer is connected t...

Page 14: ...e Check 6 2 1 Concrete Test Hammer If possible carry out the performance check every time before you use the device however at least every 1000 impacts or 3 months Fig 6 1 Performance check of the con...

Page 15: ...gth ways section through the concrete test hammer page 16 6 4 1 Stripping Down Warning Never strip down adjust or clean the slider and guide rod 4 see Fig 6 2 page 16 otherwise the slider friction may...

Page 16: ...all amount of grease to the screw head of the screw 20 Slide the hammer guide bar 7 through the hammer mass 14 Insert the retaining spring 15 into the hole in the impact plunger 1 Slide the hammer gui...

Page 17: ...ssion spring 13 Pawl 14 Hammer mass 14 1 model ND 14 2 model LD 15 Retaining spring 16 Impact spring 17 Guide sleeve 18 Felt washer 19 Resistance element with input socket 20 Trip screw 21 Locknut 22...

Page 18: ...Concrete test hammer z z Display unit z z Carrying strap z z Test hammer cable z z Transfer cable z z Grindstone z z Protection sleeve for z z display unit Operating instructions z z Calibration cert...

Page 19: ...ay Unit Measuring range from 10 to 70 N mm2 compressive strength of the concrete Non volatile memory for max 500 measurement series of 10 measurements each Graphics LC display 128 x 128 pixels Interfa...

Page 20: ...e from concrete consisting of good quality fine gravel maximum particle size 32 mm and Portland cement Empirical values The conversion curve is practically independent of the Cement content of the con...

Page 21: ...tone e g pumice brick rubble gneiss result in a strength value lower than shown on the conversion curve Gravel with a preponderance of smooth polished surfa ces and spherical shape results in values f...

Page 22: ...pair of values Rm fckm applies to a certain range of the measured rebound value R It is necessary to test samples of differing qualities and or ages in order to prepare a new conversion curve for the...

Reviews: