10
© 2012 by Proceq SA
4 Real Tests – Potential Measurements
4.6
Prepare the test
surface
3
Complete
Getting Started
4.1
Planning and
preparation
4.4
Connect to the
reinforcement
4.5
Functional check
of the instrument
5.4
Check instrument
configuration
4.7 Is a direct measurement on the concrete surface possible?
Yes
No
Can the influence from surface
coatings be estimated and
compensated?
Yes
No
Remove the
surface coating
4.8, 4.9 Pre-moisten the surface if required and carry out the measurement
4.10 Evaluate the data
4.11 Confirm and refine corrosion hotspot positions at openings in the concrete
Measurement
2
Read the
Tutorial
Understand the principle and application limits of the
half cell potential measurement method.