
MT-1/WT3 User Guide
Page •
23
Installation of the Socket
1.
Meter Removal
WARNING:
Do not remove the meter when it is under a heavy load to avoid sparks. The front
jaws of the meter base are live;
do not stick your hands or any metal objects into
the meter base! Certified safety glasses and rubber gloves are strongly
recommended.
Carefully remove the meter from its meter base
according to your company safety
procedures
. Avoid removing the meter under heavy load due to sparks. Before
removing the meter from a CT rated meter base,
make sure to short the secondary
CT's
to prevent equipment damages and personal injuries.
Make sure that the wiring connecting the meter to the line is compatible with one
of the configurations shown in Appendix B. If not compatible, stop here and put the
meter back into place. Field-testing with the MT-1/WT3 is not possible for that meter
installation.
2. Installation of the MT-1/WT3 Socket
1
Make sure the power switch of the MT-1/WT3 socket is OFF. Check Appendix B to
setup the twist-tabs and the Form Selector before inserting into the meter base.
With ringless meter base, remove the latch if necessary, using the quick release
mechanism.
Firmly take the MT-1/WT3 socket with the arrow pointing upward and align the rear
tabs of the socket with the front jaws of the meter base. Then firmly insert the
MT-1/WT3 socket into the meter base. Secure the installation. For ring-type meter
bases, a latch can be purchased as an option.
1
When the MT-1/WT3 is used in the meter shop, do not plug it in a test board. It will not run
properly. You may use a single-phase four-jaw meter base of at least 150VA capacity and keep
the Form Selector in the 1S/2S/15S position for all types of meters. The nominal voltage must
be respected according to the meter being tested.
Summary of Contents for MT-1/WT3
Page 1: ...MT 1 WT3 USER GUIDE HIGH ACCURACY THREE PHASE WIRELESS WATTHOUR METER TESTER...
Page 9: ...Probewell Lab Inc Page 8...
Page 12: ...MT 1 WT3 User Guide Page 11 Side View of the Socket Fig 2 2 Side View of the Socket...
Page 21: ...Probewell Lab Inc Page 20...
Page 43: ...Probewell Lab Inc Page 42...
Page 47: ...Probewell Lab Inc Page 46...
Page 49: ...Probewell Lab Inc Page 48 Form 1S...
Page 50: ...MT 1 WT3 User Guide Page 49 Form 2S...
Page 71: ...Probewell Lab Inc Page 70 Form 12S 25S 3N N Network...
Page 72: ...MT 1 WT3 User Guide Page 71 Form 12S 25S 3 25S Delta...
Page 73: ...Probewell Lab Inc Page 72 Form 14S 4Y s...
Page 74: ...MT 1 WT3 User Guide Page 73 Form 15S 4...
Page 75: ...Probewell Lab Inc Page 74 Form 16S 4Y...
Page 77: ...Probewell Lab Inc Page 76...
Page 83: ...Probewell Lab Inc Page 82...
Page 85: ...Probewell Lab Inc Page 84 Notes...
Page 86: ...www probewell com Probewell Lab Inc Printed in Canada Edition 2 2...