18
888-545-1254 | www.PrecisionRatedOptics.com
PRO-790
3.6.2. Pigtail Preparing and setting
1)
Prepare the pigtail
2)
Place the pigtail fiber in cleaver, cleave length is 16mm
3)
Place the prepared pigtail in Fiber Holder
4)
Close the pressure pad and prepare the right side fiber
3.6.3. Drop cable preparing and setting
1)
Prepare the drop cable as needed
2)
Place the drop cable in cleaver, the cleave length is 16mm
Summary of Contents for PRO-790
Page 1: ...PRO 790 Fusion Splicer Operation Guide...
Page 44: ...44 888 545 1254 www PrecisionRatedOptics com PRO 790...
Page 45: ......