![Princess auto mr.blacksmith Owner'S Manual Download Page 15](http://html1.mh-extra.com/html/princess-auto/mr-blacksmith/mr-blacksmith_owners-manual_1602976015.webp)
voltage drops too low to support the operation, a
STOP: Voltage at control unit SBC xx.xV
(minimum 12.47V) message indicating battery low is displayed. If the voltage stays at a low
level, the device is not able to proceed with the service work. So stop the service by holding
EXIT
button for at least 1 second, and an
Operation failed
message will be displayed.
7. Follow onscreen instructions to complete the first phase of operation:
Connect filling and bleeding unit. Reference the vehicle service manual for tools and
equipment.
Set pressure: 2.0-2.5 bar (29
– 36psi).
Wait until the pressure has built up.
Attach a bleeder hose and open bleeder screw at rear left brake caliper.
Hold bleeder hose tight.
8. If you wish to move to the second phase of operation, press
ENTER
button as instructed.
If you do not wish to continue the service, press
EXIT
button to exit, and an
Operation failed
message is displayed.
You can exit the fluid change service at any phase of the operation with
EXIT
button.
9. To complete the second phase of operation, do the following instruction:
Turn off filling and bleeding equipment.
Wait until the pressure drops.
Disconnect filling and bleeding equipment.
10. Press
ENTER
button to move to next phase.
11. To complete the third phase, do the following as instructed:
Set pressure: 0.5bar (7psi).
Wait until the pressure has built up.
12. Press
ENTER
button to move to phase 4.
13. Following instructions on device screen to finish the fourth phase:
Reduce pressure at filling and bleeding unit to 0 bar.
Turn off filling and bleeding equipment.
Leave filling and bleeding unit connected.
Wait until the pressure drops.
If the filling and bleeding unit has a shutoff valve, close it.
Switch on filling and bleeding unit.
14. Press
ENTER
button to continue with phase 5.
15. Follow onscreen instructions to finish the fifth phase.
Set pressure: 2.0-2.5 bar (29
– 36psi). .
If present, open shutoff valve for filling and bleeding unit.
Wait until the pressure has built up.
Hold bleeder hose tight.
The pressure at the bleeder screw is greater than 100 bar!
16. Press
ENTER
button to continue.
17. Follow onscreen instructions to finish the sixth phase.
Close bleeder screw at rear right brake caliper.
Open bleeder screw at rear left brake caliper.
Hold bleeder hose tight.
18. Press
ENTER
button to continue.