background image

 

 

 

4

 

Step

 

8

 

    

Mounting

 

Bracket

 

Through

 

Screws

 

 

4

 

Corners

 

 

 

 

With

 

the

 

4

 

center

 

screws

 

in

 

place,

 

proceed

 

to

 

peel

 

off

 

the

 

paper

 

on

 

the

 

two

 

edges

 

next

 

to

 

the

 

LED

 

Light

 

channel.

  

Leave

 

the

 

center

 

piece

 

unpeeled

 

for

 

now.

 

 

Once

 

you

 

peel

 

off

 

the

 

paper

 

on

 

the

 

edges

 

you

 

will

 

see

 

the

 

O

ring

 

making

 

contact

 

with

 

the

 

acrylic

 

face

 

plate

 

if

 

the

 

O

ring

 

has

 

been

 

installed

 

properly.

 

 

Insert

 

the

 

screws

 

into

 

the

 

holes

 

and

 

begin

 

to

 

tighten.

 

Follow

 

the

 

same

 

tightening

 

process

 

as

 

you

 

did

 

previously.

 

 

Tightening

 

these

 

screws

 

to

 

hand

 

tight

 

tension

 

just

 

like

 

the

 

center

 

screws

 

is

 

adequate

 

to

 

make

 

a

 

water

 

tight

 

seal.

 

If

 

these

 

screws

 

are

 

over

 

tightened

 

it

 

WILL

 

CAUSE

 

THE

 

ACRYLIC

 

TO

 

CRACK.

   

 

The

 

below

 

picture

 

illustrates

 

the

 

level

 

of

 

tightness

 

you

 

should

 

achieve.

  

IMPORTANT:

 

If

 

you

 

see

 

that

 

the

 

acrylic

 

is

 

touching

 

(making

 

contact)

 

with

 

the

 

frame

 

then

 

the

 

screw

 

is

 

too

 

tight.

  

Untighten

 

the

 

screw

 

until

 

it

 

does

 

not

 

make

 

contact

 

with

 

the

 

frame.

  

 

 
 

 

 

 

Summary of Contents for Myriad

Page 1: ...stick again but will protect the acrylic from getting scratched while you move onto the next step Set this piece aside and proceed to Step 5 Myriad Reservoir System Congratulations on purchasing the m...

Page 2: ...rame down on your flat surface and start the O ring in one corner of the frame Begin feeding it and pressing it into the groove of the frame Take your time if you go too fast the O Ring WILL pop out A...

Page 3: ...and leak Once the central frame is properly fitted to the pump housing remove the rest of the protective paper off the acrylic face plate and lay gently on the frame Make sure the O ring is still in t...

Page 4: ...perly Insert the screws into the holes and begin to tighten Follow the same tightening process as you did previously Tightening these screws to hand tight tension just like the center screws is adequa...

Page 5: ...rneath it and tighten screws into plate Tighten the screws all the way down and then untighten approximately turn or until the plate slides back and forth Repeat for other bracket There are 8 screws p...

Page 6: ...installed cap will be perfectly horizontal with the pump and housing If the cap is crooked it will leak Unscrew the cap and repeat until the cap is installed properly Fill and Test As with any water c...

Page 7: ...VD drive that is twice as tall Insert the reservoir so its flush with the case and tighten the screws on the bracket plates You may need to remove the reservoir and repeat this process a couple times...

Reviews: