background image

 

 

 

6

 

 

                          
 

Remove

 

pump

 

from

 

stock

 

housing

 

and

 

place

 

into

 

the

 

rear

 

pump

 

mount

 

area

 

of

 

the

 

reservoir.

  

Next,

 

slip

 

pump

 

wire

 

through

 

the

 

pump

 

retaining

 

cap

 

and

 

begin

 

screwing

 

cap

 

onto

 

rear

 

pump

 

mount

 

housing,

 

securing

 

the

 

pump

 

in

 

place.

  

You

 

may

 

have

 

to

 

turn

 

the

 

cap

 

counter

 

clockwise

 

and

 

then

 

clockwise

 

to

 

properly

 

align

 

the

 

threads

 

evenly.

 

The

 

cap

 

will

 

not

 

secure

 

properly

 

if

 

crooked.

 

 
 
 

Finally,

 

tighten

 

the

 

retaining

 

cap

 

until

 

it

 

stops

 

turning.

 

 

A

 

properly

 

installed

 

cap

 

will

 

be

 

perfectly

 

horizontal

 

with

 

the

 

pump

 

and

 

housing.

  

If

 

the

 

cap

 

is

 

crooked

 

it

 

will

 

leak.

  

Unscrew

 

the

 

cap

 

and

 

repeat

 

until

 

the

 

cap

 

is

 

installed

 

properly.

 

 

                            

Fill

 

and

 

Test

  

 
 
 

 

As

 

with

 

any

 

water

 

cooling

 

project,

 

testing

 

new

 

hardware

 

before

 

putting

 

it

 

into

 

service

 

is

 

required.

 

 
 

Add

 

fluid

 

with

 

supplied

  

funnel.

  

De

Ionized

 

or

 

Distiled

 

water

 

is

 

recommended.

 

This

 

will

 

need

 

to

 

be

 

dumped

 

once

 

testing

 

is

 

complete.

 

 

Connect

  

a

 

pump

 

and

 

run

 

for

 

a

 

minimum

 

of

 

24

 

hrs.

  

After

 

24

 

hrs,

 

check

 

for

 

leaks

 

or

 

puddles

 

forming

 

near

 

the

 

reservoir.

 

As

 

long

 

as

 

your

 

O

rings

 

are

 

installed

 

properly

 

there

 

should

 

be

 

no

 

leaks.

 

 

Once

 

testing

 

is

 

complete

 

drain

 

test

 

fluid.

 

 

 

 

Summary of Contents for Myriad

Page 1: ...stick again but will protect the acrylic from getting scratched while you move onto the next step Set this piece aside and proceed to Step 5 Myriad Reservoir System Congratulations on purchasing the m...

Page 2: ...rame down on your flat surface and start the O ring in one corner of the frame Begin feeding it and pressing it into the groove of the frame Take your time if you go too fast the O Ring WILL pop out A...

Page 3: ...and leak Once the central frame is properly fitted to the pump housing remove the rest of the protective paper off the acrylic face plate and lay gently on the frame Make sure the O ring is still in t...

Page 4: ...perly Insert the screws into the holes and begin to tighten Follow the same tightening process as you did previously Tightening these screws to hand tight tension just like the center screws is adequa...

Page 5: ...rneath it and tighten screws into plate Tighten the screws all the way down and then untighten approximately turn or until the plate slides back and forth Repeat for other bracket There are 8 screws p...

Page 6: ...installed cap will be perfectly horizontal with the pump and housing If the cap is crooked it will leak Unscrew the cap and repeat until the cap is installed properly Fill and Test As with any water c...

Page 7: ...VD drive that is twice as tall Insert the reservoir so its flush with the case and tighten the screws on the bracket plates You may need to remove the reservoir and repeat this process a couple times...

Reviews: