background image

EN

G

LI

SH

ENGLISH

5

6

8

CAUTION:  Maintenance

DISASSEMBLY

1.  Replacement parts may be available at the store where you purchased 

your faucet.

2.  When  replacement  parts  are  not  available,  please  write  or  call  Price 

Pfister Consumer Service.

3. 

Always turn off water and relieve pressure before working on your 

faucet.

5  VALVE INSTALLATION

Valve Body inlets (

5A

) and outlets (

5B

) are designed to accomodate 1/2-14 NPT pipe.  

Connect pipe from Supply Valve Tub Outlet (

5C

) to Diverter Valve Body Inlet (

5A

).  Plug 

Supply Valve Shower Outlet (

5D

) with Pipe Plug (

5E

) (For Tub & Shower connections, 

do not plug Supply Valve Outlets ).

 

WARNING

:  

When attaching threaded fittings, use thread sealant or PTFE 

Plumber’s tape according to manufacturer’s instructions.

 

CAUTION:  When using iron pipes, it is not recomended to reduce outlet pipe 

diameter.

COPPER PIPE

 CAUTION: For Copper Sweat joints, it is important to remove Valve Cartridge 

(

5F

) and other Plastic Components from the Valve Body before soldering.  Use copper 

pipe adapters (not furnished) in this type of installation.

 

WARNING:  When reassembling unit, be sure that Tabs (

5G

) from Valve Cartridge  

(

5F

)  are set properly on the Valve Body Groves (

5H

).

6  OUTLET INSTALLATION

Connect Primary (

6A

) and Secondary (

6B

) Outlet pipes to Diverter Valve Body Outlets 

(

6C

).

7   UNIT START UP

Turn on hot and cold water supplies, and check all connections for leaks.

8  FLUSHING

Turn on Hot and Cold water supply lines. Use Trim Handle (

8B

) to rotate Stem (

8C

). 

Rotate Stem (

8C

) clockwise allowing water to flow to Primary Outlet (

8D

).  Rotate Stem 

(

8C

) counterclockwise allowing water to flow to Secondary Outlet (

8E

) until all foreign 

matter has cleared the line.  By having the Handle (

8B

) in the center position, water 

will flow from both Primary and Secondary outlets.  Repeat this step in the warm and 

full hot positions.

Proceed to finish wall.

3

COLD

HOT

SUPPLY

VALVE

PRIMARY 

OUTLET

SECONDARY 

OUTLET

PRIMARY 

OUTLET 

FLOW

PRIMARY 

OUTLET

SECONDARY 

OUTLET

FLOW

PRIMARY & 

SECONDARY 

OUTLETS FLOW

SECONDARY 

OUTLET

5A

5C

5D

5E

6A

6B

8F

8C

8D

8E

8B

8C

5F

5G

5F

5H

6C

5B

Summary of Contents for 15 Series

Page 1: ...ma Para notificar a Price Pfister y recibir ayuda o servicio bajo esta garantía el comprador original puede 1 llamar al 1 800 Pfaucet 1 800 732 8238 para hablar con un representante de servicio al cliente que lo pueda ayudar o 2 escribir al departamento de servicio al consumidor c o Price Pfister Inc 19701 DaVinci Lake Forest CA 92610 U S A e incluir una descripción del problema el número del mode...

Page 2: ...ve If you are replacing an existing Valve disconnect the old valve and clean the mounting surface thoroughly Align and adjust water supply pipes to recommended dimensions For new construction Install water supply pipes to recommended dimensions 2 TOOLS RECOMMENDED PTFE Plumber s Tape Slotted screwdriver Phillips Screwdriver Adjustable wrench Pipe Wrench Flashlight Cloth Thread Sealant Some additio...

Page 3: ...tic Components from the Valve Body before soldering Use copper pipe adapters not furnished in this type of installation WARNING When reassembling unit be sure that Tabs 5G from Valve Cartridge 5F are set properly on the Valve Body Groves 5H 6 OUTLET INSTALLATION Connect Primary 6A and Secondary 6B Outlet pipes to Diverter Valve Body Outlets 6C 7 UNIT START UP Turn on hot and cold water supplies an...

Page 4: ...linee y ajuste las cañerías de suministro de agua a las dimensiones recomendadas En el caso de una instalación nueva instale las cañerías de suministro de agua a las dimensiones recomendadas 2 HERRAMIENTAS RECOMENDADAS Cinta de plomero de PTFE Destornillador ranurado Destornillador Phillips Llave ajustable Llave para tubos Linterna Paño Sellador de roscas Podrían necesitarse otras herramientas 5 S...

Page 5: ...con el acabado de la pared 5 INSTALACIÓN DE LA VÁLVULA Las entradas 5A y salidas 5B del cuerpo de la válvula están diseñadas para cañería de 1 2 14 NPT Conecte la cañería desde la salida de la tina de la válvula de suministro 5C a la entrada del cuerpo de la válvula de desvío 5A Tape la salida de la ducha de la válvula de suministro 5D con el tapon para cañería 5E Para las conexiones de tina y duc...

Page 6: ...a surface de montage Alignez et ajustez les tuyaux d alimentation en eau afin qu ils aient les dimensions recommandées S il s agit d une nouvelle installation posez les tuyaux d alimentation en eau selon les dimensions recommandées 2 OUTILS RECOMMANDÉS Ruban pour tuyau en PTFE Tournevis pour écrou à fente Tournevis Phillips Clé réglable Clé à tube Lampe torche Chiffon Mastic de filetage Vous aurez...

Page 7: ... pour l eau tiède et chaude Replacez le couvercle en plastique 8A sur le corps de l inverseur 8F Finissez le mur 5 INSTALLATION DE L INVERSEUR Des orifices d entrée 5A et de sortie 5B du corps de l inverseur peuvent accueillir un tuyau de 1 2 14 NPT Branchez l orifice de sortie du robinet de bain 5C sur l orifice d entrée du corps de l inverseur 5A Bouchez l orifice de sortie du robinet d alimenta...

Page 8: ...e and Warranty Information Para obtener información mediante llamadas gratis llame al 1 800 PFAUCET 1 800 732 8238 o visite www pricepfister com Apoyo a instaladores Información sobre cuidado y garantías Pour les renseignement concernant le service san frais de Pfaucet appelez 1 800 PFAUCET 1 800 732 8238 appel ou visite www pricepfister com Aide pour le montage Rensignements sur l entretien et la...

Reviews: