PRESTO
GmbH & Co. KG
Bad Laer
04/2012 6 - 18
Once the binding process is completed, check the quality of the connection of the upper
and lower wire above the knotting device; make some improvements, if necessary (the
pre-tensioning of the wire, which occurs during normal operation, has not been applied
yet)
The processes 12 and 13 have to be carried out together at least twice with the
operating personnel.
Good knot
Knot too loose