
86/112
HEATING - PULSED AIR - 5500W - 12V
OPERATION
Electricity: The heater circuit is powered by 12V thanks to the battery backup.
Diesel: The power of the boiler is made by a dive in the fuel tank (starboard) and using a diesel
pump.
STARTING UP
- Verify that the circuit * 1V is turned on.
- Open the heater ventilation-intakes.
- Turn the control box at ON.
- Adjust the temperature of the heater using the thermostat.
LOCATION - EQUIPMENT - HEATING
1. Joining - Diesel
2. Mouth heating
3. Heater
Heater
Location: Engine compartment
Mouth heating
Control
WARNING
- Never switch off or de-energise the electric system when the engine is
running.
- Imperatively operate the stop pull handle (or button) before using the ignition
key to switch off a diesel engine.
Summary of Contents for 350
Page 1: ...PRESTIGE 350 OWNER S MANUAL S PORTS ET LOISIRS 123682 Index E ...
Page 2: ......
Page 4: ......
Page 7: ...3 112 HISTORY OF UPDATES Index A 02 2011 Index B 10 2011 Index C 11 2012 Index D 03 2013 ...
Page 8: ......
Page 10: ......
Page 11: ...7 112 SPECIFICATIONS AND WARRANTY TECHNICAL SPECIFICATIONS DESIGN CATEGORY YOUR BOAT 1 ...
Page 16: ......
Page 21: ...17 112 POSITION OF GAS BOTTLE 2 SAFETY ...
Page 35: ...31 112 HULL MAINTENANCE OF THE HULL LIFTING 3 ...
Page 38: ......
Page 49: ...45 112 STEERING SYSTEM STEERING GEAR 5 ...
Page 51: ...47 112 INTERIOR INTRODUCTION INTERIOR MAINTENANCE MAINTENANCE OF FABRICS INTERIOR EQUIPMENT 6 ...
Page 52: ...48 112 INTRODUCTION Saloon Cabins ...
Page 55: ...51 112 INTERIOR EQUIPMENT Sink Sliding hatch Must be secured while sailing 6 INTERIOR ...
Page 70: ......
Page 80: ...76 112 HYDRAULIC GANGWAY Location Maximum load 170kg Length Folded out 2 3m Control ...
Page 93: ...89 112 ENGINE GENERAL INFORMATION ENGINE INSTALLATION 9 ...
Page 105: ...101 112 LAUNCHING LAUNCHING RECOMMENDATIONS 10 ...
Page 106: ...102 112 POSITION OF HOISTING CRADLE AND STRAPS Note Measurements are expressed in mm ...
Page 108: ...104 112 Note Measurements are expressed in mm Vue avant 2950 389 389 3728 2600 2950 ...
Page 111: ...107 112 WINTER STORAGE LAYING UP PROTECTION AND MAINTENANCE 11 ...
Page 114: ......
Page 116: ......