71/112
BATTERIES
Battery charging is achieved through the alternator coupled to the engine or through use of the
220 V shore charger.
Keep the batteries charged enough (essential to ensure them a correct service life).
Make the most of time alongside to use the 220 V shore charger so as to start out sailing with
fully charged batteries.
Always check the condition of the batteries and charge system before putting to sea.
BATTERY CHARGER
Operation: The battery charger operates based on a signal processor that converts alternating
current (220V or 110V) into a direct current (12V). The operation of the charger is fully
automatic, after selecting the type of battery and load type (Refer to the instructions for use).
ADVICE - RECOMMENDATION
- It is recommended that you switch off all electrical devices before turning off the battery
switches.
- Turn off all battery switches when the vessel is unoccupied.
Batteries installation:
Engine compartment
- Engine: 2 x 110A
- Service: 2 x 110A
Charger location
12V 25A:
Technical room
8
E
L
E
C
T
R
IC
A
L
E
Q
U
IP
M
E
N
T
Summary of Contents for 350
Page 1: ...PRESTIGE 350 OWNER S MANUAL S PORTS ET LOISIRS 123682 Index E ...
Page 2: ......
Page 4: ......
Page 7: ...3 112 HISTORY OF UPDATES Index A 02 2011 Index B 10 2011 Index C 11 2012 Index D 03 2013 ...
Page 8: ......
Page 10: ......
Page 11: ...7 112 SPECIFICATIONS AND WARRANTY TECHNICAL SPECIFICATIONS DESIGN CATEGORY YOUR BOAT 1 ...
Page 16: ......
Page 21: ...17 112 POSITION OF GAS BOTTLE 2 SAFETY ...
Page 35: ...31 112 HULL MAINTENANCE OF THE HULL LIFTING 3 ...
Page 38: ......
Page 49: ...45 112 STEERING SYSTEM STEERING GEAR 5 ...
Page 51: ...47 112 INTERIOR INTRODUCTION INTERIOR MAINTENANCE MAINTENANCE OF FABRICS INTERIOR EQUIPMENT 6 ...
Page 52: ...48 112 INTRODUCTION Saloon Cabins ...
Page 55: ...51 112 INTERIOR EQUIPMENT Sink Sliding hatch Must be secured while sailing 6 INTERIOR ...
Page 70: ......
Page 80: ...76 112 HYDRAULIC GANGWAY Location Maximum load 170kg Length Folded out 2 3m Control ...
Page 93: ...89 112 ENGINE GENERAL INFORMATION ENGINE INSTALLATION 9 ...
Page 105: ...101 112 LAUNCHING LAUNCHING RECOMMENDATIONS 10 ...
Page 106: ...102 112 POSITION OF HOISTING CRADLE AND STRAPS Note Measurements are expressed in mm ...
Page 108: ...104 112 Note Measurements are expressed in mm Vue avant 2950 389 389 3728 2600 2950 ...
Page 111: ...107 112 WINTER STORAGE LAYING UP PROTECTION AND MAINTENANCE 11 ...
Page 114: ......
Page 116: ......