Page 4 of 16
STEP 2
Insert cams into holes on the top of the left and right sides
Estimated Time: 5 minutes
2a
2b
Insert green twister dowels into remaining holes on the left and right sides
Left Side
Right Side
There are 3 hole on the
front
edge
of the left and right sides.
There are 3 hole on the
front
edge
of the left and right sides.
IMPORTANT: Identify the front edge of the
left and right sides before starting Step 3