Page 8 of 16
STEP 6
Estimated Time: 4 minutes
GENTLY
hammer plastic dowels
HALFWAY
into all
holes on the underside of the top
Position the gables so the finished edge faces the finished edge
of the top and the shelf holes face inwards. Then press down
firmly until they are attached.
6a
6b
Front
Finished Edge
(Front)
Finished Edge
(Front)
Shelf Holes
Front