background image

Page 5 of 16

STEP 3

Estimated Time: 5 minutes

Attach 

ONE SIDE ONLY

 to both stabilizers and to the fixed shelf. Tighten cams 

slightly. Make sure the stabilzers and shelf are positioned squarely with the side.
Fully tighten cams using a flathead screwdriver.

Position the fixed shelf as shown with the finished edge on the floor.  Position both 
stabilizers with the finished side down.

Left 
Side

Stabilizers

Fixed Shelf

Finished Edge 
(Front)

Unlocked

Locked

Turn 210°

Tightening Cams

Summary of Contents for SH-6643

Page 1: ...tions Sonoma Monterey Montego Broadway Chelsea Winslow CALL US FIRST 1 877 PREPAC1 1 877 773 7221 Mon Fri 7am 4pm PST 10am 7pm EST For help with assembly If you have received a damaged or defective pa...

Page 2: ...A 0770 Maple GA 0710 Black GA 0790 Cherry GA 0760 Espresso GA 0700 White Right Gable 1 GA 0771 Maple GA 0701 White GA 0711 Black GA 0791 Cherry GA 0761 Espresso Adjustable Shelf 1 SH 0294 Maple SH 070...

Page 3: ...TEP 1 Insert cams into all pieces Estimated Time 5 minutes 1a 1b Stabilizers Lie stabilizers and fixed shelf on the floor Finished Edge Front Fixed Shelf NOTE Shaded areas represent the UNFINISHED sid...

Page 4: ...b Insert green twister dowels into remaining holes on the left and right sides Left Side Right Side There are 3 hole on the front edge of the left and right sides There are 3 hole on the front edge of...

Page 5: ...sure the stabilzers and shelf are positioned squarely with the side Fully tighten cams using a flathead screwdriver Position the fixed shelf as shown with the finished edge on the floor Position both...

Page 6: ...Page 6 of 16 STEP 4 Estimated Time 5 minutes Repeat to attach the 2nd side Make sure the pieces are square Fixed Shelf Unlocked Locked Turn 210 Tightening Cams...

Page 7: ...s Fixed Shelf STEP 5 Estimated Time 5 minutes Hammer levelling feet to the bottom of each side Attach L brackets with Washerhead Screws to secure front panels to fixed shelf 5a 5b 8 9 16 Washerhead Sc...

Page 8: ...ALFWAY into all holes on the underside of the top Position the gables so the finished edge faces the finished edge of the top and the shelf holes face inwards Then press down firmly until they are att...

Page 9: ...ent i t n STEP 7 Estimated Time 5 minutes Position the front molding in place and press down firmly to secure b n Parts Iden ifica ion Ca i et t t STEP 8 Estimated Time 5 minutes Screw in green twiste...

Page 10: ...Page 10 of 16 Par s if ca io Cabinet t Ident i t n STEP 9 Estimated Time 5 minutes Lower top and gables onto left and right sides and tighten cams Unlocked Locked Turn 210 Tightening Cams FRONT...

Page 11: ...Page 11 of 16 STEP 10 Estimated Time 5 minutes Attach gables to fixed shelf with Confirmat screws Confirmat Screws FRONT...

Page 12: ...Page 12 of 16 Par s if ca io Cabinet t Ident i t n STEP 11 Estimated Time 5 minutes Attach Backer with nails C C Position nails in the center of the board...

Page 13: ...Page 13 of 16 Hammer plastic dowels halfway into side moldings Par s if ca io Cabinet t Ident i t n STEP 12 Estimated Time 5 minutes Firmly press side molding into place 12a 12b...

Page 14: ...mend you secure the Headboard to your bed frame to increase stability particulary if your bed is on castors Stabilizers are NOT pre drilled because of the wide variation in bed frame heights and hole...

Page 15: ...Page 15 of 16 THIS PAGE INTENTIONALLY LEFT BLANK...

Page 16: ...ximize the life span and look of your unit Q Can I paint or varnish your products A Our products are made from durable composite woods with a laminate finish and therefore should not be painted or var...

Reviews: